TBRD Water Leak Repair
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Amendment 0001 - The purpose of this amendment is to attach the Questions and Answers and Site Visit Sign-In Sheet. This amendment also attaches an updated Schedule of Items, Attachment 5. Quote Due Date has not changed. The Tonto National Forest - Tonto Basin Ranger District - plans to repair leaks in its drinking water network. The main objective of the project is to eliminate the known leaks and reduce potential for future leaks. At the end of the project, the contractor shall provide as-built drawings of the project to the Forest Service. Leaks were noticed on the secondary pipes that feed 1- or 2-inch recreation hydrants. The Forest Service plans to relocate the hydrants to the main lines, abandoning the leaking pipes in place. One known leak to be repaired may be under the asphalt of the campground loop. After backfilling the trench, the contractor must place new asphalt over the cut portion and make necessary adjustments to return the loop to its original shape. The contractor shall install one priority valve and two pressure reduction valves at the locations indicated by the Contracting Officer's Representative (COR). These values are critical in reducing and addressing potential leaks in the future. The contractor shall provide all personnel, equipment, tools, and materials to accomplish the project. The contractor is responsible for the supervision, incidentals, and services required to perform the work in strict accordance with the applicable codes and requirements and the contract document.
Similar open contracts
TBRD Water Leak Repair
The Tonto National Forest - Tonto Basin Ranger District - plans to repair leaks in its drinking water network. The main objective of the project is to eliminate the known leaks and reduce potential fo…
TBRD Water Leak Repair
The Tonto National Forest - Tonto Basin Ranger District - plans to repair leaks in its drinking water network. The main objective of the project is to eliminate the known leaks and reduce potential fo…
GAOA LDV Crystal Lakes Water & Septic Resuscitation, PSICC, Colorado
On September 1, 2026, amendment 0001 to solicitation 1240LT26Q0107 - GAOA LDV Crystal Lakes Water & Septic Resuscitation at Pikes National Forest has been posted to SAM.gov and accomplished the follow…
Z--BLM-CO TRFO BASIN WELL AND WATER SYSTEM
BLM-CO TRFO BASIN WELL AND WATER SYSTEM IMPROVEMENTS AMENDMENT 2 (09/01/2026)- This amendment is to extend the due date to 09/17/2026 8am MD, final questions due 08/14/2026 8am MD, add Q&A, and update…
SOR Waterline Repair
The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control syste…
SOR Waterline Repair
The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control syste…