Z--BLM-CO TRFO BASIN WELL AND WATER SYSTEM
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
BLM-CO TRFO BASIN WELL AND WATER SYSTEM IMPROVEMENTS AMENDMENT 2 (09/01/2026)- This amendment is to extend the due date to 09/17/2026 8am MD, final questions due 08/14/2026 8am MD, add Q&A, and update evaluation information. There will not be a formal site visit. Unaccompanied site visits are available. Please utilize the coordinates in the PWS to properly locate the site. This solicitation is being amended to reopened to change the set aside to 100% Total Small Business due to original set-aside resulting in no responses, post it to open market (SAM.gov), update terms and conditions, and adding attachments. All questions are due by September 14, 2026 8am MD. This is a solicitation announcement for well improvements of a well house located at the Bureau of Land Management TRFO Basin Well, Montrose County, Colorado near Naturita, CO. 1.1 PROJECT DESCRIPTION Contractor shall provide a turnkey solar powered, well water system that automatically provides and maintains water to a wildlife drinking tank with minimal human input except winterization and annual maintenance. System shall be designed to have a solar pumping system at an existing water well. Provide water to an elevated buried storage tank. The buried storage tank will gravity feed the drinking tank. An additional tee and valve shall be provided for a future upgrade for a stockwater tank. System shall be designed to be freeze proof and operational in the winter to the frost free hydrant at the drinking tank. 1.2 LOCATION Latitude: 38.06529167� N Longitude: -108.63154723� W From Naturita, CO. Travel south on CO-141 for approximately 12 miles. Turn right (west) on County Road U29. Travel approximately 5 miles. The project is on the left (south). 1.3 WORK SCHEDULE Work shall be completed within 360 days of the Notice to Proceed. Contractor shall complete all work within 360 days of starting work. Work is not allowed on Federal holidays. Work shall occur Monday through Friday. Contract time will be paused, upon re…
Similar open contracts
Z--BLM-CO TRFO BASIN WELL AND WATER SYSTEM
BLM-CO TRFO BASIN WELL AND WATER SYSTEM IMPROVEMENTS AMENDMENT 3 (09/03/2026)- This amendment is to add Q&A. This solicitation is being amended to reopened to change the set aside to 100% Total Small …
Z--BLM-CO TRFO BASIN WELL AND WATER SYSTEM
BLM-CO TRFO BASIN WELL AND WATER SYSTEM IMPROVEMENTS This solicitation is being amended to reopened to change the set aside to 100% Total Small Business due to original set-aside resulting in no respo…
BLM-CO TRFO BASIN WELL AND WATER SYSTEM
BLM-CO TRFO BASIN WELL AND WATER SYSTEM IMPROVEMENTS This is a solicitation announcement for well improvements of a well house located at the Bureau of Land Management TRFO Basin Well, Montrose County…
Y--BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT
BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT AMENDMENT 4 (09/01/2026)- This amendment is to extend the due date to 10/23/2026 1200 MD, final questions due 10/14/2026 1200 MD, and to set the site visit f…
Y--BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT
BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT This solicitation is being amended to reopened to change the set aside to 100% Total Small Business due to original set-aside resulting in no responses, post…
Y--BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT
BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT AMENDMENT 5- (09/02/2026)- Correction to site visit date. Site visit is 09/17/2026 11am MD. All questions are due by October 14, 2026 1200 MD. This is a soli…