Project Number 653-105, Seismic Retrofit of Building 16, Roseburg VAMC, Oregon
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Extended to Dec 10, 2026 by a later notice
Description
NO PROPOSALS ARE BEING REQUESTED AT THIS TIME. THIS NOTICE SERVES AS THE 15 DAY PRE-SOLICITATION NOTICE PRIOR TO ISSUANCE OF THE FORMAL SOLICITATION. DESCRIPTION: The Department of Veterans Affairs (VA), Office of Facilities and Construction Management (CFM), has a requirement for Project Number 653-105, Seismic Retrofit of Building 16, Roseburg VAMC, Oregon. The project� is in� Building� 16� which houses� the� chapel/auditorium� on the Roseburg VAMC campus. This project includes� a full seismic retrofit of the� 16,569� square foot (GSF)� building.� The Contractor� will� provide all labor, materials and equipment for the demolition and construction services needed to complete this project.� All work� will� meet SOW,� drawings,� and specification requirements as well as any applicable manufacturer s recommended installation procedures.� � The renovation includes� the following, as well as all work in the specifications and drawings:� Demolition, New construction, Interior alterations, and Seismic retrofit. The above list is intended to serve as a starting point for� construction� and does not� represent� the only� information in� determining� the project scope.� � TYPE OF CONTRACT AND NAICS: This acquisition will result in one (1) Firm Fixed Price Contract. The contract period of performance is anticipated to be Four Hundred Seventy-Five (475) calendar days from issuance of the Notice to Proceed (NTP). The North American Industry Classification System (NAICS) code is 236220-Commercial and Institutional Building Construction, with size standard of $45,000,000. TYPE OF SET-ASIDE: This acquisition is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) competition. CONSTRUCTION MAGNITUDE: In accordance with VAAR 836.204, the magnitude of this construction project is anticipated to be between $10,000,000 and $20,000,000. SELECTION PROCESS: The proposals will be evaluated using a Best Value source selection process. This is a one-phase Design-Bid-Build procuremen…
Notice history (2)
- Jul 21, 2026PresolicitationDue Aug 10, 2026Viewing
- Nov 10, 2026SolicitationDue Dec 10, 2026