657-26-102JC FCA Replace Various Roofs on BLDG 1, JC
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Presolicitation Notice Presolicitation Notice Page 5 of 5 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 5 DESCRIPTION TITLE OF PROJECT: 657-26-102JC FCA Replace Various Roofs on BLDG 1, JC Solicitation 36C25527R0012 Scope of work: The General Description: VA Saint Louis Health Care System, John Cochran Division, requires a Construction Contractor to to replace various roofs identified through FCA report. Project will replace existing roofing beyond its useful life at JC. Roofs: R01, R02, R03, R18, R23, R26, R27, R28, R30, R31, R36,and R37; totaling approximately 44,000 SF. The following roof areas are modified bitumen roofs that have exceeded their useful life and should be replaced soon: R01, R02, R03, R18, R23, R26, R27, R28, R30, R31, R36, and R37.All work shall be performed in accordance with solicitation/contract terms and conditions,specifications and drawings, and all applicable VA TIL and local and National codes. Contractorshall furnish all supervision, tools, labor, materials, equipment, transportation and testingnecessary. Contractor will perform site investigations to fully inform themselves of the conditions and limitations applied to the work.T his project has a set of drawings and specifications. These drawings and specifications indicate the work to be performed. Work includes, but is not limited to, general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures, associated appurtenances and certain other items necessary completion. All work shall be performed in accordance with solicitation/contract terms and conditions, specifications and drawings, and all applicable VA TIL and local and National codes. Contractor shall furnish all supervision, tools, labor, materials, equipment, transportation and testing necessary. Contractor will perform site investigations to fully inform themselves of the conditions and limitations applied to the work. All p…