Chickahominy Riverfront Park Pool
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Provide the complete renovation and restoration of the swimming pool to provide a structurally sound, safe, durable, accessible, and fully operational aquatic facility. The project will include removal and replacement of the existing pool interior surface, waterline tile, water-depth marker tile located within the pool, water-depth marker tile located outside the pool/on the pool deck, and pool coping; inspection of the exposed pool structure and circulation/drainage components; repair or replacement of damaged components as necessary; replacement of main drain covers; and improvements to pool access features. NON-MANDATORY A Non-mandatory conference will be held at 1350 John Tyler Hwy, Williamsburg, VA 23185on Monday, October 19, 2026 @ 10:00am. Bidders are strongly encouraged to walk the project site.