Dallas ISD, TX

W.W. Samuell High School Replacement - CMAR Trade Bid Advertisement

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

Dallas ISD

Department

Construction Services

Solicitation Type

Competitive Sealed Proposal

Category

Demolition Services · Earthwork Construction · Site Work and Site Preparation · Asphalt Testing Equipment · Landscape Irrigation / Sprinkler System · Park Structures (Restrooms, Shelters, Pavilions) · Bricks, Pavers, Masonry Supplies · Millwork · Waterproofing Services · Building Envelope Design and Maintenance · Flooring Installation · Auditorium/Theater Construction · HVAC Maintenance, Repair, and Installation Service · Low Voltage Cabling · Electrical Construction

Performance State

TX

Posted

Sun, November 8, 2026

Response Deadline

Thu, December 10, 2026

Description

SFP2, A Joint Venture, LLC, as Construction Manager at Risk for Dallas ISD, seeks budget pricing to construct a new three-level replacement high school, W.W. Samuell High School, at 8928 Palisade Drive, Dallas, TX 75217. The project is approximately 311,000 SF and the architect is Corgan. The package covers Divisions 02–33 and is based on the 95% Construction Drawings and Specifications. The new campus is a Type II-B, fully sprinklered facility with Educational (E) as the primary occupancy and Assembly (A-1) and Business (B) accessory spaces. Major elements of the work include: • Building: Three-level building with mechanical penthouses and partial crawlspace; exterior of brick and stone veneer, storefront and curtainwall glazing, and long-span canopies with wood-look soffits • Roofing: Modified bitumen and standing seam metal panel roof systems • Storm shelter: Designated storm shelter areas with insulated concrete form (ICF) walls and special inspection requirements • Program spaces: Commons and Honor Walk, two auditoriums (main auditorium about 888 seats), black box theater, band/orchestra/choral suites, competition and P.E. gymnasiums, athletic locker rooms, science and career/technology labs, ROTC (including range), enhanced-acoustics classrooms, and food service/kitchen • MEP/FP: Plumbing, HVAC with VAV terminal units and an outdoor chiller yard, fire protection, fire alarm, and electrical • Site: Civil and utilities, paving including Prairie Creek Road, retaining walls, landscape and irrigation, athletic site work (track and field, baseball, softball, soccer, sports courts), tennis courts, and a concession building. Trade Package Information Budget pricing is requested for the following major trade packages (Divisions 02–33): • Demolition and site preparation • Earthwork and excavation • Site utilities (water, sanitary, storm) • Paving, curbs, and flatwork • Landscaping and irrigation • Athletic site elements and concession building • Fencing, site furnishing…

Similar open contracts