South Dakota

A&E Services, Renovate Lg Male & Female Latrines; SF Foss Field Armory

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

State of South Dakota

Solicitation #

26SOI19962

Solicitation Type

Invitation Only

Performance State

SD

Posted

Fri, September 4, 2026

Response Deadline

Wed, September 16, 2026

Description

RE: REQUEST FOR STATEMENTS OF INTERESTRENOVATE LARGE MALE AND FEMALE LATRINES – SIOUX FALLS FOSS FIELD ARMORY Sioux Falls, SDPN# 467110The South Dakota Department of the Military is soliciting Statements of Interest from firms interested in providing professional Architectural and Engineering services for the above referenced project. Project will include all phases of professional consulting services for renovating existing primary women's and men's latrines, locker/changing room, and showers. Design shall maximize space usage, while meeting all currently adoptedcodes. Consultant shall conduct an analysis of the HVAC system for the capacity. Should HVAC components require replacement, a structural engineer may be required to verify strength limitations and required modifications to support new equipment.Services to be provided include:• Site Investigation• Design Development• Construction Administration (Later Date)AE teams shall include and identify, but not limited to, the following services: • Architect• Structural Engineer (dependent on HVAC equipment analysis)• Mechanical Engineer• Electrical Engineer Anticipated project timeline is as follows: • AE Team Selection September 2026 • 30% Design Due February 2027• 90% Design Due TBD • Construction Documents TBD• Bidding Opening TBD Firms desiring to be considered for providing professional services for this project should send a Statement of Interest thatoutlines their qualifications and experience for this project. Statements of Interest should clearly address each of thefollowing criteria:1. Project approach and methodology from programming phase through closeout meeting the project requirements (20 pts)2. Project teams specialized expertise, capabilities, and technical competence to meet the project requirements (20 pts)3. Ability and proven history in handling special project constraints (Projects of Similar Scope, Time/Schedule, and Cost) (15 pts)4. Proposed project management techniques. (15 pts)5. Proven kn

Similar open contracts