Z1DA--LOADING DOCK CONCRETE REPAIRS
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
DEPARTMENT OF VETERANS AFFAIRS Network Contracting Office 6 (NCO 6) Sources Sought Notice: 36C24626Q1077 In accordance with Federal Acquisition Regulation (FAR) Overhaul Part 10.000 this Request for Information is for planning purposes only and shall not be construed as a Request for Proposal (RFP), Invitation for Bid (IFB), Request for Quotation (RFQ), nor an offer to negotiate or as an obligation on the part of the Department of Veterans Affairs. Responses are strictly voluntary. Respondents will not be compensated, and all information becomes property of the Government upon submission. Additionally, the Government reserves the right to revise and refine contract requirements before the release of any associated solicitation. 1. Title. Loading Dock Concrete Repair 2. Background. The Central Virginia VA Health Care System is requesting loading dock concrete repair at the Richmond VA Medical Center (VAMC). The loading dock treads and risers are damaged and is a safety concern. Period of Performance: project should take approximately 90 days to complete. 3. Scope. This statement of work outlines the labor, materials, safety requirements and construction processes required to repair the loading dock structure at the Richmond VA Medical Center. All work shall be performed in accordance with VA Design Guides, VA Master Specifications, OSHA 29 CFR 1926, and applicable state, federal, and local regulations. The contractor will repair the existing structure as well as the stairs treads and risers to the proper height as previous measurements. The contractor will also use rebar and steel dowls for added structure strength. The contractor will use 350 PSI concrete and install yellow safety treads on the existing stairs. The contractor will also seal the concrete to protect it from weather. The contractor will provide all labor, materials, tools, equipment, travel, qualified service technicians and supervision. 4. Specific Tasks. Key tasks include: Demolish existing failed co…