CON-NRM-663A4-24-209 Replace Fire Suppression Systems BLDG 61
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Presolicitation Notice Presolicitation Notice Page 4 of 4 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 4 663A4-24-209 Replace Fire Suppression Systems Building 61 VA Puget Sound Medical Center - American Lake 9600 Veterans Drive Southwest, Lakewood, WA, 98439 Procurement Number: 36C26027R0008 This is a pre-solicitation notice synopsizing an upcoming competitive solicitation for a planned construction requirement. An invitation for Request for Proposals (RFP) is anticipated to be posted on or about November 2, 2026. The Veterans Affairs (VA) Puget Sound Medical Center-American Lake located in Lakewood, WA, has a requirement for a Firmed Fixed Price construction project to Replace Fire Suppression System to Building 61. Description of Services: Project Number 663A4-24-209 Replace Fire Suppression System to Building 61. Contractor shall provide all labor, materials, and equipment to replace the fire suppression systems at Building 61 in accordance with the associated and published/provided contract 100% Construction Documents (Drawings, Specifications, etc.). The Government requires the newly replaced systems to operate seamlessly with the existing systems at the American Lake campus. The replacement of the existing systems is to be performed within tolerance delineated in the Manufacturer's Installation Instructions. The new replacement packages will be submitted in accordance with the contract submittal process and approved by the Government prior to the Contractor proceeding with any part of the scope of work. Work includes all associated aspects, including but not limited to, cutting and patching, and repair of finishes. Removal and disposal of existing equipment, materials etc. Replacement of the dry-pipe sprinkler system in the attic, including connection to existing fire alarm system and new nitrogen generator Installation of the new fire alarm control panel 1st, 2nd & 3rd floor replacement of sprinkler heads and installation of new f…