ConVault Tank Installation
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Installation of the 12,000-gallon Diesel Fuel Storage Tank for the standby generator engine. The Village of Wellington-furnished equipment shall consist of an aboveground, steel fuel storage tank with secondary containment by concrete encasement and appurtenances required for a complete system as specified herein. Scope of work includes removal of existing failed 12,000-gallon ConVault tank. All materials to be demolished shall be disposed of legally off-site. The Village of Wellington will be responsible for draining the existing diesel fuel from the tank prior to removal. Contractor shall include in their bid the costs needed to coordinate this effort with the Village of Wellington. Contractor shall provide forty-eight (48) hours notice to the Village of Wellington prior to demolition. Tank may be hauled away and disposed of legally off-site or demolished onsite for hauling. Contractor to provide all equipment, dumpsters, etc. required for disposal. Demolition may occur at or immediately adjacent to the tank's current location, as the Village does not intend to relocate or break the existing foundation. Tank demolition must not interfere with deliveries or plant operations. NON-MANDATORY An optional pre-bid meeting and site visit will be held on October 7, 2026, at 9:00 AM (Local Time) at the Village of Wellington Wastewater Treatment Plant, located at 11860 Pierson Rd, Wellington, FL 33414.