Shaw Avenue Paving from Fruit to West Avenues
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
<p>The scope of work includes but is not limited to; pavement rehabilitation of approximately 0.5 miles</p><p>of along Shaw Avenue, extending from Fruit Avenue to West Avenue. The scope of work includes</p><p>milling 0.3 feet of existing pavement surface and placing 0.34 feet asphalt overlay. Additional</p><p>improvements include reconstruction of curb ramps to meet ADA standards, adjustment of</p><p>manholes and valve covers, installation of updated signage and road striping, and replacement of</p><p>traffic loops.</p> <p>SEE BID SPECIFICATIONS FOR FULL DETAILS</p>
Similar open contracts
224th Street East – Asphalt Overlay (SR-7 to 70th Ave E) - CRP 5110
This project provides for the improvement of 224th Street East from east of State Route 7 to 70th Avenue East by resurfacing the roadway with Hot Mix Asphalt, reconstructing curb ramps, and other work…
220016 & 220017 4800 Area Paving AVENUES & STREETS
MANDATORY SITE VISIT AND PRE-BID MEETING as stated in the ITB General Project Description (See SCOPE OF WORK for complete details): The work generally consists of: Repave the AVENUES & STREETS identif…
220025 & 220024 3600 Area Paving AVENUES & STREETS
MANDATORY SITE VISIT AND PRE-BID MEETING as stated in the ITB General Project Description (See SCOPE OF WORK for complete details): The work generally consists of: Repave the AVENUES & STREETS identif…
220015 & 220011 4700 Area Paving AVENUES & STREETS
MANDATORY SITE VISIT AND PRE-BID MEETING as stated in the ITB General Project Description (See SCOPE OF WORK for complete details): The work generally consists of: Repave the AVENUES & STREETS identif…
2026/2027 Paving Project – Citywide Arterial Base Repair Various Locations
In general, the work consists of localized base repair on arterial roads throughout the City as shown in the enclosed project plans and tables. Work is to include but is not limited to: hot-mix asphal…
220011 4700 Area Paving STREETS
Please note this project (as stated int the ITB) has a MANDATORY SITE VISIT AND PRE-BID MEETING: General Project Description (See SCOPE OF WORK for complete details): The work generally consists of: R…