Wyandotte County, KS

On Call Wastewater, Stormwater, & Flood Management Facility Maintenance

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

Unified Government of Wyandotte County and Kansas City, KS

Category

Building and Facilities Management Services · ELEVATORS, ESCALATORS, AND MOVING WALKS, BUILDING TYPE · Conveyors, Bucket Type, Not Road Building · Pumps, Miscellaneous, (Not Otherwise Classified) · Sewage and Sludge Pumps, Submersible · Sewage and Sludge Pumps, Surface Mounted · Water Pumps, Including Parts and Accessories (See 060-35 for Automotive Type) · Industrial Equipment, Not Construction and Repair, or HVAC Maintenance and Repair · Pumps and Pump Accessories Maintenance and Repair · Water Supply and Sewage Treatment Equipment Maintenance and Repair · Water Supply, Treatment and Distribution, Architectural Services · Waste Water Treatment Engineering · Water Supply, Treatment, and Distribution Engineering · BUILDING CONSTRUCTION SERVICES, NEW, INCLUDING MAINTENANCE AND REPAIR SERVICES · BUILDING MAINTENANCE, INSTALLATION AND REPAIR SERVICES · Construction and Upgrades, Wastewater Treatment Plant · Maintenance and Repair, Wastewater Treatment Plant · Heating, Ventilating and Air Conditioning (HVAC) · Wastewater Treatment Plant, Operations, and Testing · Water and Wastewater Treatment Services

Performance State

KS

Posted

Thu, September 10, 2026

Response Deadline

Wed, October 28, 2026

Description

The Unified Government is requesting qualifications for on call contracts within the following services separated by three categories. Inspection, Preventative Maintenance, Corrective Maintenance and HVAC equipment for equipment in Environmental Services wastewater, stormwater and flood management facilities. Next is Facility Repairs; inspect, repair, rehabilitate and/or replace equipment in the facilities. Third is SCADA system maintenance and integration. MANDATORY September 24, 2026, are THREE separate mandatory pre-proposal meetings. Please refer to Article IV Section 4 in each category for the time and details.

Similar open contracts