Federal Contract

Allegheny River Lock and Dam 2 Interlock and Traffic Control System Replacement

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

DEPT OF THE ARMY

NAICS Code

237990

Set-Aside

SBA

Department

DEPT OF DEFENSE

Solicitation Type

Presolicitation

Solicitation #

W911WN27BA002

PSC Code

Z1KA

Division

W072 ENDIST PITTSBURGH

Performance State

PA

Posted

Mon, November 23, 2026

Response Deadline

Tue, December 8, 2026

Description

This is a Presolicitation Notice only. This is not a Solicitation (Invitation for Bid). No contract will be issued from this announcement. Any applicable attachments for this project (i.e. Specifications and Drawings) will be issued at the time of the Solicitation, not during this notice. This procurement is a 100% Small Business Set-Aside. All interested and capable small businesses are encouraged to submit a bid. Project Description The U.S. Army Corps of Engineers, Pittsburgh District, has a project for the lock chamber at Allegheny River Lock and Dam 2 on the Allegheny River. The project includes the rehabilitation of the existing valve interlock control system with valve-to-gate interlocks and the rehabilitation of the existing traffic control system. General project features include the installation of cables, limit switches, control panels, a PLC enclosure, miscellaneous electrical equipment, and hydraulic equipment. The new interlock and traffic control system shall consist of a centrally located PLC enclosure for the lock chamber. The PLC enclosure shall be the main control enclosure for the interlock and traffic control system. All limit switches on the miter gates and in the miter gate machinery recesses shall be hardwired to terminal blocks in the PLC enclosure. The enclosure shall have key operated bypass switch for the interlock system, an alarm light to indicate when the interlock system has been bypassed or hydraulic valves have failed to function, and a reset button to reset the alarm condition after the function of the hydraulic valves has been verified. New cables shall be installed throughout the lock, excluding the lock chamber cross over, to achieve a fully functional system. New proximity limit switches shall be placed for the interlock system to determine whether the miter gates are currently mitered and for the traffic system to determine if the gates are completely recessed. New control panels will control and monitor the traffic system and…

Similar open contracts