Federal Contract

Split-Unit HVAC Replacement

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

US SPECIAL OPERATIONS COMMAND (USSOCOM)

NAICS Code

238220

Set-Aside

SBA

Department

DEPT OF DEFENSE

Solicitation Type

Combined Synopsis/Solicitation

Solicitation #

H9242126QE047

PSC Code

N041

Division

HQ USSOCOM

Performance State

WA

Posted

Thu, September 17, 2026

Response Deadline

Thu, September 24, 2026

Description

All questions must be submitted in writing to the Contracting Officer by September 21, 2026 at 5:00p.m (EDT). A site visit will be conducted on September 18, 2026 at 1:30p.m (PDT). Personnel attending the site visit will meet at 9190 Cramer Ave, Joint Base Lewis-McChord, WA 98433. An escort is required for the site visit and will be provided by the Government. Point of contact for the site visit is CPT Megan Colpo (925) 917-0784. Contact the POC for assistance with directions and notify her of arrival due to the escort requirement. Personnel that do not have access to JBLM must go through the Visitor Center at Liberty Gate to receive a visitor's pass. Requirements for the visitor's pass includes REAL ID (passport and social security card for those that do not have a REAL ID), valid driver's license, and vehicle insurance information. Desription of Work This non-personal services contract requires the contractor to provide all necessary personnel, equipment, materials, and labor to remove and replace 16 nonfunctional ductless heat pump A/C systems with new, cooling-only split A/C systems. The work will take place across multiple First Special Forces Group (Airborne) headquarters and augmentation facilities (Buildings 9160/9162, 9190, 9934, and 9983) to establish optimal operational temperatures for critical computer and communication systems. The contractor operates independently under its own supervision, remaining fully accountable to the Government for meeting all performance standards. The scope of work includes disconnecting and reconnecting power and refrigerant lines, removing and disposing of the nonworking units, and installing and testing the new cooling-only units. Additionally, the contractor must add external condensation pumps, purge and test existing drain lines, and replace them as needed. The designated period of performance for this mission-critical climate control upgrade is scheduled from September 28, 2026, to November 12, 2026.

Similar open contracts