Bonneville Powerhouse II Unwatering Pump Replacement
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
11/05/2026: The solicitation is attached. NOTICE OF SOLICITATION NUMBER CHANGE The Bonneville Powerhouse II Unwatering Pump Replacement acquisition, previously announced under presolicitation notice number W9127N26BA018, is now identified as W9127N27BA012 due to the fiscal-year transition. This presolicitation notice continues the announcement of the same acquisition under the new number; it does not represent a separate requirement. All subsequent notices and solicitation documents for this acquisition will reference solicitation number W9127N27BA012. The original presolicitation notice under W9127N26BA018 is available here: https://sam.gov/workspace/contract/opp/dce799052d0043619ff7a08ccb237c50/view The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for Unwatering Pump Replacement at the Bonneville Lock and Dam Powerhouse II. Contractor access to the work site will be from Interstate 84 on the Oregon side of the Columbia River via Exit 40, approximately four miles west of Cascade Locks, Oregon. All work for this project is in Skamania County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI), and requires the contractor and or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 1 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful bidder must have a current CMMC status at Level 1 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the bidder ineligible for contract award. CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI on contractor information systems in the performance of…
Notice history (4)
- Nov 5, 2026Presolicitation
- Nov 5, 2026Presolicitation
- Nov 5, 2026SolicitationDue Dec 7, 2026
- Nov 5, 2026SolicitationDue Dec 7, 2026Viewing