Z2NZ--659-24-203: Extend Chilled Water to Hospice and Audiology
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Provide chilled water from the building 31 primary chiller to serve Buildings 42 and 43, bypassing the existing chillers in 42 and 43 during normal operation. Normal Operation (Primary from Building 31) � Building 42 and Building 43 are served directly from building 31 chilled-water plant. � The existing chillers for 42 and 43 are isolated and not in use. � Valves and actuators shall be connected to the Building Management System (BMS) and automatically controlled for mode selection. Bypass Mode (Local Chillers in Service) � Building 42: The existing chiller serves the 2" chilled-water line supplying Audiology. Glycol shall be replenished through the pot feeder. � Building 43: The existing chiller serves the 3" chilled-water line supplying the building. Glycol shall be replenished through the pot feeder. New Work / Modifications � Install additional pumps in Building 42 to serve the 2" chilled-water line to Audiology.
Similar open contracts
Z2NZ--659-24-203: Extend Chilled Water to Hospice and Audiology
Provide chilled water from the building 31 primary chiller to serve Buildings 42 and 43, bypassing the existing chillers in 42 and 43 during normal operation. Normal Operation (Primary from Building 3…
Z1DA--Upgrade Chiller Plant Construction Northport - Project 632-25-101
Work includes general construction and alterations, of the existing chiller plant and includes the necessary removal of existing building components, systems, construction and installation of certain …
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chil…
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chil…
MMW Chiller For Balance of Plant
7/16/26 Amendment No. 1 posted to address the technical questions received. At this time we do not need to extend the due date. This procurement is for a single, self-contained, outdoor-rated 20-ton a…
Replace Pumps Bldg. 97
The Contractor shall provide all necessary work for the replacement of chiller pumps at Building 97 project located at the Kerrville VA Medical Center, 3600 Memorial Blvd., Kerrville, TX, 78028 as des…