Free Preview
Government contracts for hvac contractors in North Dakota
A snapshot of open federal, state, and local opportunities in North Dakota, updated daily. To search them and get daily matches for your business, sign up free.
About hvac contractors contracts in North Dakota
Hvac contractors contracts in North Dakota typically cover chiller and rooftop-unit replacements, building-automation (BAS) upgrades, indoor-air-quality remediation, preventive-maintenance contracts, and mechanical retrofits at aging federal facilities. Federal posts in this category fall under NAICS 238220 (Plumbing, Heating, and Air-Conditioning Contractors), and the bulk of the work flows to GSA, the Department of Veterans Affairs, and major DoD installations. Many HVAC IDIQs are reserved for small business and SDVOSB pools, especially on VA campuses.
North Dakota currently has 7 open hvac contractors contracts in our database, with 6 added in the last 30 days. That's a steady cadence — enough flow to make automated alerting worthwhile rather than manual portal-checking. The most active buyers are DEPT OF THE AIR FORCE (3 open posts) and FEDERAL AVIATION ADMINISTRATION (3), with the rest spread across other federal civilian agencies, DoD components, and state and local departments active in North Dakota.
Beyond federal opportunities, much of the hvac contractors work in North Dakota is posted through NDBuys, with recurring buyers including the North Dakota Department of Transportation and the North Dakota University System. The State Procurement Office consolidates most contracting through NDBuys, North Dakota's central online sourcing system. ContractRadar pulls federal postings from SAM.gov alongside state and local feeds so an HVAC contractor doesn't have to monitor each portal manually.
Top matching contracts in North Dakota
Chiller Replacement - Hector International Airport (FAR) Airport Traffic Control Tower (ATCT)
Amendment 01 - Incorporating Q&A The Federal Aviation Administration (FAA) has a requirement for a chiller replacement at the Hector International Airport (FAR) Airport Traffic Control Tower (ATCT) in…
Chiller Replacement - Hector International Airport (FAR) Airport Traffic Control Tower (ATCT)
Amendment 01 - Incorporating Q&A The Federal Aviation Administration (FAA) has a requirement for a chiller replacement at the Hector International Airport (FAR) Airport Traffic Control Tower (ATCT) in…
Boiler Maintenance
The boiler maintenance will provide all management, tools, supplies, equipment and labor necessary to perform all the work in maintaining 94 existing boilers/water heaters located in 71 facilities acr…
Boiler Maintenance
The boiler maintenance will provide all management, tools, supplies, equipment and labor necessary to perform all the work in maintaining 94 existing boilers/water heaters located in 71 facilities acr…
Chiller Replacement - Hector International Airport (FAR) Airport Traffic Control Tower (ATCT)
The Federal Aviation Administration (FAA) has a requirement for a chiller replacement at the Hector International Airport (FAR) Airport Traffic Control Tower (ATCT) in Fargo, North Dakota. This solici…
Boiler Maintenance
The boiler maintenance will provide all management, tools, supplies, equipment and labor necessary to perform all the work in maintaining 94 existing boilers/water heaters located in 71 facilities acr…