Oxnard, CA

4th Street Mobility Improvements Project and Downtown Bus Stop Improvements Project

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

City of Oxnard

Solicitation #

PW 23-59

Performance State

CA

Posted

Tue, August 4, 2026

Response Deadline

Wed, September 9, 2026

Description

The 2018 edition of the Standard Specifications for Public Works Construction and all amendments to the Standard Specification for Public Works Construction 2021 Edition (collectively the “Greenbook”) is incorporated by this reference. As more specifically described in the Contract Documents, the Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to construct new concrete sidewalk, curb and gutter, road reconstruction, driveway reconstruction, electrical conduit and pull boxes for street lighting, traffic signals, bus shelters and street furniture, bike lanes, landscaping and irrigation system along 4th Street from C Street to Oxnard Boulevard with striping improvements continuing on 4th Street and Meta Street to the intersection of Meta Street and 6th Street. Additionally, approximately 50 bus stops will be improved throughout the downtown area. The Work includes the removal of existing curb, gutter, sidewalk and pavement, replacement and modification of traffic signals, removal and replacement of street lighting, removal and replacement of street trees and tree well grates; placement and compaction of asphalt concrete pavement; excavation and reconstruction of a portion of 4th Street; concrete works; adjust utility covers to finished grade; installation of storm drain lines and appurtenant concrete structures; and traffic striping. All prospective bidders are invited and strongly encouraged to attend a non-mandatory pre-bid meeting on August 20, 2026, at 10:00am PST, at City Council Chambers located at 305 W. Third Street, First Floor, Oxnard, CA 93030. Prospective bidders are encouraged to ask questions, address problems, and other issues regarding this project during this meeting. All questions, other than those asked at the pre-bid meeting and not specifically addressed within the Contract Documents, must be submitted electronically to the PlanetBids electronic bidding portal at https://vendors.plan

Similar open contracts

OXN

Construction Management for 4th Street Mobility Improvements and Downtown Bus Stop Improvements Projects

The City of Oxnard is requesting proposals from experienced construction management firms to provide construction management and inspections services for the upcoming 4th Street Mobility and Downtown …

City of OxnardPerformance: CADue Sep 29, 2026Posted Aug 21, 2026
Solicitation #: RFP 27-16
SAL

2026 Pavement Improvements Project

The work within the Base Bid, in general, shall include furnishing all labor, materials, tools, equipment, and incidentals required for construction in accordance with the Plans and these Specificatio…

City of SalinasPerformance: CADue Sep 11, 2026Posted Aug 13, 2026
Preference Program: A Bid shall not be accepted, nor any con…NAICS Code: 237310 · 237990License Required: Type ADepartment: PW Dept: Engr & Transportation Div.
OXN

South Oxnard Center Lighting Project

As more specifically described in the Bid Package, the Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to remove existing lighting syste…

City of OxnardPerformance: CADue Sep 15, 2026Posted Aug 10, 2026
Solicitation #: PW 25-90
MOV

Sherman Avenue Sidewalk Improvements (CDBG Fiscal Year 25/26)

The Contractor shall furnish, to the satisfaction of the Engineer, all labor, materials, tools, equipment, and incidentals, unless otherwise specified, to construct and complete the work in compliance…

City of Moreno ValleyPerformance: CADue Sep 15, 2026Posted Aug 22, 2026
Solicitation #: 2026-510
RIV

Third Street Grade Separation at BNSF Railroad

The project generally includes the construction of an underpass at the location of Third Street and the BNSF tracks. The project consists of, but is not limited to, the following major activities: • …

City of RiversidePerformance: CADue Sep 8, 2026Posted Jul 16, 2026
Solicitation #: 8225
CA

25-300703 Tree Stump Removal and Concrete Pavement Repair 100057

TREE STUMP REMOVAL AND CONCRETE PAVEMENT REPAIR FACILITIES MANAGEMENT DIVISION CALNET ¿ BUILDING 057 SACRAMENTO, SACRAMENTO COUNTY, CALIFORNIA CONTRACT NUMBER: 25-300703, PROJECT NUMBER: 100057 This …

Department of General ServicesPerformance: CADue Sep 14, 2026Posted Jul 30, 2026