FY26 Willapa Harbor Maintenance Dredging
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
PRE-SOLICITATION NOTICE This Synopsis/Pre-Solicitation Notice is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming. All questions regarding this Synopsis/Pre-Solicitation should be submitted in writing to the Point of Contact(s) indicated below. Construction Project: FY26 Willapa Harbor Maintenance Dredging Pre-solicitation Notice Number: W912DW26Z1ATA The magnitude of construction is estimated to be between $5,000,000 and $10,000,000. The resulting contract will be firm-fixed-price. FY26 Willapa Harbor Maintenance Dredging Project Details: USACE Seattle District has a need for a construction dredging, project entitled FY26 Willapa Harbor Maintenance Dredging, Willapa Harbor, WA at three federal navigation features in Willapa Bay, Washington: (1) the entrance to Tokeland Marina; (2) the entrance channel to Nahcotta; and (3) the Bay Center entrance channel and basin. The work is anticipated to begin in July 2026 and all in-water work must be completed by 15 Feb 2027. The project will require dredging via mechanical (clamshell) means to remove approximately 180,000 CY of accumulated sediment across the three project features. The minimum required dredging depth varies from -10 ft (Bay Center and Nahcotta) to -15 ft MLLW (Tokeland). In addition, dredging of approximately 10,000 CY may be required to a minimum depth of -9 ft MLLW in the Palix River thalweg to ensure sufficient water depths for the dredge, scow, and tugboats to transit to/from Bay Center and the disposal sites. This amount has the potential to change due to the dynamic nature of the Palix River at its confluence with Willapa Bay. Dredged material will be disposed via bottom-dump barge at the Cape Shoalwater and/or South Channel open-water disposal locations within Willapa Bay. The work window varies by project features, but ranges between 16 July through 15 Feb of any given calendar year for each specific project feature. The in-water work windows are as follows: � Tokeland Marina: 1…
Similar open contracts
FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDA
DESCRIPTION OF WORK: The U.S. Army Corps of Engineers, Jacksonville District, intends to issue an Invitation for Bid (IFB) to award a single firm fixed-price contract. Project work includes maintenanc…
Bonneville Powerhouse II Unwatering Pump Replacement
The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for Unwatering Pump Replacement at the Bonneville Lock and Dam Powerhouse II. Contractor access to the work site will…
Bonneville Powerhouse II Unwatering Pump Replacement
The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for Unwatering Pump Replacement at the Bonneville Lock and Dam Powerhouse II. Contractor access to the work site will…
FY26 Harlingen Placement Area (PA)13 and 10 Improvements
SOURCES SOUGHT SYNOPSIS TITLE: FY26 Harlingen Placement Area (PA)13 and 10 Improvements Notice Type: SOURCES SOUGHT SYNOPSIS Source Sought Number: W912HY-26-S-1AX4 The U.S. Army Corps of Engineers, Ga…
USACE National Enterprise Dredging Center Scope Dredge to Budget Contract
Sources Sought Notice for USACE National Enterprise Dredging Center Scope Dredge to Budget Contract This is a Sources Sought/Request for Information only. This is NOT a Solicitation Announcement, nor …
USACE National Enterprise Dredging Center Scope Dredge to Budget Contract
Sources Sought Notice for USACE National Enterprise Dredging Center Scope Dredge to Budget Contract This is a Sources Sought/Request for Information only. This is NOT a Solicitation Announcement, nor …