TC Dock Structural Repairs
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Government requires structural repairs to the existing TC Dock structures at Joint Base Lindsey Graham to return the facilities to a condition that supports safe operations. The project is Design-Bid Build. The work consists of a Base Bid and three Bid options. Base Bid includes: � Underdeck repair of concrete elements (spalls, cracks, and other defects) requiring work overwater in confined spaces subject to daily tidal fluctuations. � Repair of existing timber piles by installation of fiberglass jackets. � Structural upgrades to North Ramp 5 and North Ramp 5 Extension, including demolition of existing concrete deck to access and strengthen pile caps with cast-in-place concrete, followed by in-kind replacement of the concrete deck. Bid Option 1: Drainage upgrades to the Original TC Dock and North Dock Extension, including demolition of existing concrete deck and construction of a new, thicker cast-in-place concrete deck Bid Option 2: Replacement of a broken square concrete batter pile at the outboard face of Bent 111. Work includes demolition of the remaining pile and pile cap above water, driving a new square concrete batter pile, and construction of a new cast-in-place pile cap. Bid Option 3: Reutilization of an outboard batter pile at Bent 135 that has detached from the pile cap. Work includes demolition of the existing concrete pile cap and construction of a new extended cast-in-place pile cap to reconnect the pile.