Federal Contract

Parachute Packing Press

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

DEPT OF THE NAVY

NAICS Code

336413

Department

DEPT OF DEFENSE

Solicitation Type

Presolicitation

Solicitation #

N6833526Q1223

PSC Code

1670

Division

NAVAIR WARFARE CTR AIRCRAFT DIV

Posted

Tue, September 22, 2026

Response Deadline

Wed, October 7, 2026

Extended to Dec 3, 2026 by a later notice

Description

This effort is for the procurement of (1) Parachute Packing Press Model GSU-449/E (PN: COM00150-1; NSN: 1670-99-555-6604) for the F/A-18 Kuwait Classic program. Under authority 10 U.S.C.2304(c)(1) and implemented in FAR 6.302-1(b)(1)(i), this authority shall be used when the program needs can only be satisfied from only one source with unique capabilities. Any attempt to procure a different part number would require the Government to fund a Preliminary Design Review (PDR) Critical Design Review (CDR) First Article Test (FAT) and Test & Evaluation (T&E) effort for a new vendor. The Government would have to fund personnel to be on the Source Selection Team to review proposals. Any change in form, fit or function would require changes to the existing Integrated Logistics Support (ILS) (technical publications, spares inventory, calibration) which would incur additional costs for update in the amount of $200,000 to $250,000. The process required to obtain an alternate asset is cost-prohibitive and would force the FMS Partner to utilize an asset that is not supported, compatible or interchangeable with the USN-approved configuration. This requirement will be processed under the authority FAR 6.302-1(b)(1)(i), whereby only one source with unique capability can supply the requested item. Market Research was performed by the Lakehurst Technical team. The Original Equipment Manufacturer of these items is Allied Defense Industries | Cage 0GD25. The US Government does have some technical data rights (e.g., drawings), but is unable to compete this request due to specific proprietary items to Eaton within the design of the end item. Acquisition Method Code: 3H - acquire directly from the manufacturer/US GOV does not have sufficient data. No additional market research was conducted for the reasons discussed above, and as such, it is the Governmnt's intention to conduct the repair procurement on a sole-source basis to Allied Defense Industries | Cage 0GD25.

Notice history (4)

  1. Sep 22, 2026PresolicitationDue Oct 7, 2026Viewing
  1. Sep 30, 2026PresolicitationDue Oct 14, 2026

    UPDATED/CORRECTED: This effort is for the procurement of (1) Parachute Packing Press Model GSU-449/E (PN: COM00150-1; NSN: 1670-99-555-6604) for the F/A-18 Kuwait Classic program. Under authority 10 U.S.C.2304(c)(1) and implemented in FAR 6.302-l(b)(l), to try to develop this �asset" would incur costs that are not expected to be recouped through competition. Any attempt to procure a different part number would require the Government to fund a Preliminary Design Review (PDR) Critical Design Review (CDR) First Article Test (FAT) and Test & Evaluation (T&E) effort for a new vendor. The Government would have to fund personnel to be on the Source Selection Team to review proposals. Any change in form, fit or function would require changes to the existing Integrated Logistics Support (ILS) (technical publications, spares inventory, calibration) which would incur additional costs for update in the amount of $100,000 to $150,000. The process required to obtain an alternate asset is cost-prohibitive and would force the FMS Partner to utilize an asset that is not supported, compatible or interchangeable with the USN-approved configuration. Hence, the FMS partner would forfeit the fundamental benefits granted per the signed Letter of Acceptance (LOA). This requirement will be processed under the authority 10 U.S.C.2304(c)(1), only one responsible source and no other supplies or services will satisfy agency requirements. Market Research was performed by the Lakehurst Technical team. The

  2. Nov 19, 2026PresolicitationDue Dec 3, 2026

    UPDATED/CORRECTED: This effort is for the procurement of (1) Parachute Packing Press Model GSU-449/E (PN: COM00150-1; NSN: 1670-99-555-6604) for the F/A-18 Kuwait Classic program. Under authority 10 U.S.C.2304(c)(1) and implemented in FAR 6.302-l(b)(l), to try to develop this �asset" would incur costs that are not expected to be recouped through competition. Any attempt to procure a different part number would require the Government to fund a Preliminary Design Review (PDR) Critical Design Review (CDR) First Article Test (FAT) and Test & Evaluation (T&E) effort for a new vendor. The Government would have to fund personnel to be on the Source Selection Team to review proposals. Any change in form, fit or function would require changes to the existing Integrated Logistics Support (ILS) (technical publications, spares inventory, calibration) which would incur additional costs for update in the amount of $100,000 to $150,000. The process required to obtain an alternate asset is cost-prohibitive and would force the FMS Partner to utilize an asset that is not supported, compatible or interchangeable with the USN-approved configuration. Hence, the FMS partner would forfeit the fundamental benefits granted per the signed Letter of Acceptance (LOA). This requirement will be processed under the authority 10 U.S.C.2304(c)(1), only one responsible source and no other supplies or services will satisfy agency requirements. Market Research was performed by the Lakehurst Technical team. The

  3. Nov 19, 2026PresolicitationDue Dec 3, 2026

    UPDATED/CORRECTED: This effort is for the procurement of (1) Parachute Packing Press Model GSU-449/E (PN: COM00150-1; NSN: 1670-99-555-6604) for the F/A-18 Kuwait Classic program. Under authority 10 U.S.C.2304(c)(1) and implemented in FAR 6.302-l(b)(l), to try to develop this �asset" would incur costs that are not expected to be recouped through competition. Any attempt to procure a different part number would require the Government to fund a Preliminary Design Review (PDR) Critical Design Review (CDR) First Article Test (FAT) and Test & Evaluation (T&E) effort for a new vendor. The Government would have to fund personnel to be on the Source Selection Team to review proposals. Any change in form, fit or function would require changes to the existing Integrated Logistics Support (ILS) (technical publications, spares inventory, calibration) which would incur additional costs for update in the amount of $100,000 to $150,000. The process required to obtain an alternate asset is cost-prohibitive and would force the FMS Partner to utilize an asset that is not supported, compatible or interchangeable with the USN-approved configuration. Hence, the FMS partner would forfeit the fundamental benefits granted per the signed Letter of Acceptance (LOA). This requirement will be processed under the authority 10 U.S.C.2304(c)(1), only one responsible source and no other supplies or services will satisfy agency requirements. Market Research was performed by the Lakehurst Technical team. The

Similar open contracts