Federal Contract

54--IA-NEAL SMITH NWR-TEMP MODULAR OFFICE

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

DEPARTMENTAL OFFICES

NAICS Code

321991

Set-Aside

SBA

Department

INTERIOR, DEPARTMENT OF THE

Solicitation Type

Combined Synopsis/Solicitation

Solicitation #

140F0S26Q0051

PSC Code

5410

Division

FWS CONTRACTING ACTIVITY

Performance State

OR

Posted

Tue, October 6, 2026

Response Deadline

Mon, October 12, 2026

Description

IA - Temp Modular Office Space approx. 36X56 The setup of the temporary office space is expected to be completed and turned over for government occupancy on 11/30/26 and the first day of billing for the base year rental will be 11/30/26. Vendor will submit a packet with drawings and description for the office space that meets the SOW to be offered and a written plan for the installation and set up. Submit a filled out a price sheet, 1st page of the packet. This is a rental contract for temporary office space, not a construction contract. Bonding is not required. See attached packet. For questions and to submit your packet, email robert_sung@ios.doi.gov with "140F0S26Q0051" in the subject line Additional RFI item: Q: The maintenance yard that this modular building is to be located shows a gravel surface. Unless ADA requirements changed this month, that would not be an acceptable surface for a ramp. Asphalt or concrete, or a solid, smooth surface is needed. Is a ramp needed as I am not seeing anything that indicates a handicap parking area is needed for the ramp to terminate? A: ADA and ABA require level and slip-resistant landings that are free of obstructions. Compacted gravel meets this requirement. Provide accessible ramps per the scope of work. Q: Is low voltage wiring required for phone/data? A: Yes Q: Will office furniture be needed? A: No. Q: When is the expected move in date acceptance of the office space 11/30/26. Contract will start on 11/30/26, but can be adjusted as needed. Temporary office space is expected to be fully set (utilities) up on date the contract starts. NOTE: Vendor is no longer required to submit mockups, however Floor plans/drawings and a written description is required.

Similar open contracts