CHO Airport ITB - TERMINAL CHILLER REPLACEMENT
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Charlottesville-Albemarle Airport Authority is seeking bids from qualified firms experienced in the construction, installation, and testing of hydronic mechanical piping systems, centrifugal pumps, and HVAC Chiller equipment. The proposed Work includes the following: Replacement of existing water-cooled centrifugal chiller with new air cooled chiller. Replacement of chilled water circulating pumps. Replacement of air separator, expansion tank and other hydronic accessories. Demolition of existing cooling tower and condenser water circulating pumps. Hydronic piping modifications. Electrical system modifications to support installation of new chiller equipment and pumps. *** VISIT https://gocho.com/organization-info/public-notices/ FOR ITB SUBMISSION REQUIREMENTS, BID DOCUMENTS, AND ADDENDA ***
Similar open contracts
ITB No. 26-2989-8EAR - Water Treatment Facility - HVAC Improvements
The Work consists of all work required by the Construction Documents necessary for the HVAC Improvements project at the Henrico County Department of Public Utilitiesâ Water Treatment Facility (WTF) …
J041--558-22-172, Replace Chillers in AHU 1 and 2
Project Number: 558-22-172--Replace Chillers for AHU 1 and 2 replaces the aging auxiliary chillers for air handler units 1 and 2, and all associated equipment identified in design for replacement or u…
Z1DZ--556-24-106 CON: Replace Chiller No. 02 Re-Solicitation
Pre-Solicitation Notice Solicitation: 36C25226B0040 Project: 556-24-106 Replace Chiller No. 02 Location: Captain James A. Lovell Federal Health Care Center (FHCC) 3001 Breen Bay Road North Chicago, IL…
In-Row Cooling Tower Replacements
Hampton Roads Transit (HRT) is seeking a qualified Contractor to complete the turn-key upgrade and replacement of six (6) Schnider Electric Uniflair Chilled Water In-Row Cooling Towers deployed at HRT…
Replace Chiller 2, B500
Project Title: Replace Chiller 2, B500 Description: This requirement consists of removing the existing chiller located in the basement level of B500 and installing a brand-new, fully operational repla…
Replace Chiller 2, B500
Project Title: Replace Chiller 2, B500 Description: This requirement consists of removing the existing chiller located in the basement level of B500 and installing a brand-new, fully operational repla…