Federal Contract

UPDATED: 9/8/2026 - 37250PR260000050 - USCG AIR STATION SAN DIEGO CREW BERTHING ROOMS RENOVATIONS - CONSTRUCTION

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

US COAST GUARD

NAICS Code

236118

Set-Aside

SBA

Department

HOMELAND SECURITY, DEPARTMENT OF

Solicitation Type

Combined Synopsis/Solicitation

Solicitation #

37250PR260000050

PSC Code

Z2JZ

Division

BASE LOS ANGELES/LONG BEACH(00037)

Performance State

CA

Posted

Tue, September 8, 2026

Response Deadline

Sat, September 19, 2026

Description

UPDATE: PHOTOS HAVE BEEN ADDED TO SOLICITION EVALUATION TERMS ADDED: FAR 52.212 - RELEVANT PAST PERFORMANCE AND PRICE ARE MORE IMPORTANT Solicitation: Aircrew Duty Berthing Renovations Set-Aside: Total Small Business Set-Aside (FAR Subpart 19.5) Location: USCG Sector San Diego, Building D (Aircrew Duty Berthing Room), 2170 N. Harbor Drive, San Diego, CA 92101 Important Dates Questions Due: September 15, 2026 Proposals Due: September 18, 2026, by 11:59 PM Eastern Time 1. Project Background and Objective The U.S. Coast Guard requires complete renovations of the Aircrew Duty Berthing Room in Building D at Sector San Diego. The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary to modernize the space for active-duty personnel. 2. Scope of Work (Summary) - Please review the attached Statement of Work (SOW) for full technical requirements, safety standards, and applicable codes. The Contractor is responsible for the demolition of existing materials and the installation of new commercial-grade fixtures. Key tasks include: Lighting Renovation: Replace existing light fixtures with new fully dimmable LED fixtures featuring a selectable red-light mode across 6 sleeping rooms, 1 central hallway, and 1 bathroom. Bathroom Renovation: Demolish existing fixtures, tile, and shower pan. Install a new commercial-grade toilet, sink/vanity with enclosed storage, shower pan, low-maintenance sheet vinyl flooring, and a new mirror. Flooring Installation: Remove approximately 590 sq ft of existing carpet and install new Luxury Vinyl Plank (LVP) flooring, including new baseboards and trim. Interior Painting: Prepare and paint all interior walls and trim in the 6 sleeping rooms and the common passageway. 3. Site Conditions & Hazardous Materials An Asbestos and Lead Survey was conducted for this facility (AESS Job No. 26-092). Asbestos: No asbestos was detected in the Berthing Room in Building D. Lead: Lead was detected at v

Similar open contracts