2026 St. Mary¿s Dr. Storm Improvements & Paving
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Work to be completed for the 2026 St. Mary¿s Dr. Storm Improvements & Paving is described briefly as follows: The project consists of removing approx.. 30 LF of existing 24¿ RCP across a road and replacing it with 30 LF of 30¿ RCP, removing & replacing 2 double wing catch basins, remove & replace approx.. 100 LF of curb & gutter, cut 2 ex. 15¿ HDPE storm pipes from the inside that are protruding into ex. 30¿ CMP and seal the connections. Project includes approx.. 2700 LF of resurfacing/milling & overlay improvements on St Mary¿s Dr.. Work includes (but is not limited to) asphalt milling, Open-Graded Interlayer asphaltic concrete, asphalt pavement overlay, asphalt leveling course, pavement striping and marking replacement, overlay/pavement patch, traffic control, erosion control, and other miscellaneous work.