Wrightsburg Way Paving Improvements
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Improvements along Wrightsburg Way within the City of Zebulon include edge milling of existing asphalt pavement, full-depth pavement patching, asphalt leveling, placement of 1.5-inch, 9.5 mm Superpave asphalt overlay, traffic control, striping and signage, and all labor, materials, equipment, and incidental work necessary to complete the project. Milling is limited to approx. 7-foot widths at the pavement edges adjacent to the existing gutter line, and to an approx. 15-foot length at the end of the project limits where the proposed overlay ends. The depth of milling will transition from zero inches at the existing roadway grade to a maximum depth of 1.5 inches below grade so that the endpoints of the 1.5-inch overlay will transition smoothly to existing grade, both at the gutter line and at the existing roadway at the project limits. All work shall conform to the latest edition of the Georgia Department of Transportation Standard Specifications for the Construction of Transportation Systems and applicable supplemental specifications. Pay items shall be measured and paid in accordance with the GDOT specifications associated with the item number shown in the Bid Schedule unless otherwise noted.
Similar open contracts
RESURFACING OF VARIOUS CITY STREETS
The principal items of construction are: Deep patching, milling, spot leveling, resurfacing and striping of various City Streets for approximately 9.8 centerline miles of resurfacing. All work shall b…
27-008 FY26 LMIG Resurfacing Project
The City of Sandy Springs is soliciting sealed bids for the work consisting of milling and resurfacing approximately 22.35 miles of roadway throughout the City, including milling to a minimum depth of…
FY2026 GTIB Paving Improvements
The project will consist of 3,446 SY of Graded Aggregate Base and driveway piping for a new road, 1,694 SY of variable depth milling, 938 SY of Full Depth Reclamation, 37 SY of patching, 3,343 Tons of…
Water System Improvements to serve GA HWY 362 Connector
Sealed Bids for the construction of the Water System Improvements to serve GA HWY 362 Connector will be received, by Pike County Water & Sewerage Authority, at 7818 US-19 South, Zebulon, Georgia 30295…
SB009-27 Ezzard Street Pavement Rehabilitation Project
The project is located on Ezzard Street in Lawrenceville, Georgia, with the project limits extending from Paper Mill Road to Shoal Creek (Approximately 1,500 LF). Formal bids will be received by the…
ITB 26-141 Small County Outreach Program (SCOP) Milling & Resurfacing Project for E. Gospel Island Rd (CR 470) from N. Apopka Ave. to SR 44
Citrus County, Florida (“County”) invites interested and qualified Contractors to submit a Bid for a SCOP project on, E. Gospel Island Road (CR 470) from N. Apopka Ave. to SR 44 will consist of millin…