26-16 Buc880725C (Buchanan)
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
This project is for a nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, tied concrete block mat installation, tile installation, water control structure, riprap, and seeding. This project includes about 22,900 cubic yards of earthwork, installation of 2,500 square feet of tied concrete block mat, water control structure, 1270 linear feet (LF) of tile installation, 30.5 tons of erosion stone, and 6 acres of seeding. The estimated construction cost range for this project is $180,000 to $200,000. Completion Dates: Construction: November 15, 2027 Seeding: December 15, 2027 (Structure and Buffer Seedings must follow the seeding period stipulated in the Technical Specifications)