Youghiogheny Resource Managers Building Siding Replacement
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Youghiogheny Resource Managers Building Siding Replacement. USACE, Pittsburgh District, has an upcoming requirement to replace the siding of the Resource Managers Office at Youghiogheny River Lake. The work described herein shall be performed at the Youghiogheny Resource Managers Office (RMO) building located within the Youghiogheny River Lake project area in Confluence, Pennsylvania. The building currently serves as administrative office space for the U.S. Army Corps of Engineers. The RMO building was constructed in 1986 and is a multi-level, timber-framed structure built into the hillside overlooking the impoundment side of the dam. The exterior walls consist of 2x6 wood stud framing with 6-inch fiberglass batt insulation (R-19, foil-faced). Interior partitions consist of 2x4 wood studs with 1/2-inch gypsum wallboard. The existing exterior wall assembly consists of 1/2-inch asphalt-saturated fibrous sheathing with 5/8-inch cedar-faced T1-11 plywood siding, for a combined nominal thickness of 1-1/8 inches. Exterior trim and fascia consist of various widths of cedar lumber. The building is supported by cast-in-place concrete footings and 12-inch concrete masonry unit (CMU) foundation walls. The rear wall section and balcony framing are supported by 4 feet-0 inches wide by 5 feet-0 inches deep concrete footings, laminated wood columns (8-3/4 inches x 15 feet-0 inches), and laminated wood beams (8-3/4 inches x 15 feet-0 inches).This project consists of the removal and replacement of the existing exterior wall cladding system. The Contractor shall remove and dispose of the existing T1-11 siding and 1/2-inch asphalt-saturated fibrous sheathing in their entirety. The Contractor shall furnish and install a new exterior wall assembly consisting of 1/2-inch APA-rated structural wood sheathing, a continuous weather-resistive barrier (WRB), 3/8-inch nominal preservative-treated wood furring strips, and 5/16-inch fiber cement lap siding in accordance with manufacturer requirem…
Similar open contracts
Youghiogheny Resource Managers Building Siding Replacement
Youghiogheny Resource Managers Building Siding Replacement. USACE, Pittsburgh District, has an upcoming requirement to replace the siding of the Resource Managers Office at Youghiogheny River Lake. Th…
Borough of Etna, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
This is a Presolicitation Notice only. This is not a Solicitation (Request for Quote). No purchase order will be awarded from this announcement. Any applicable attachments for this project (i.e., Draw…
JP Martha Float Mooring Bitts Retrofit
JP Martha Float Mooring Bitts Retrofit - The United States Army Corps of Engineers, (USACE) Pittsburgh District has a requirement for the retrofitting of existing hydraulic structures within an active…
Town of Cairo - Water System Improvement Project
Town of Cairo Water System Improvements Town of Cairo, Cairo, West Virginia The U.S. Army Corps of Engineers, Pittsburgh District, is carrying out a project to upgrade the existing water distribution …
Town of Cairo - Water System Improvement Project
Town of Cairo Water System Improvements Town of Cairo, Cairo, West Virginia The U.S. Army Corps of Engineers, Pittsburgh District, is carrying out a project to upgrade the existing water distribution …
Design-Build Maintenance and Repair of the General Stilwell Memorial Army Reserve Center (ARC) Training Building 1520, TX
AMENDMENT 0005 WAS POSTED ON 03 SEPTEMBER 2026 AMENDMENT 0004 WAS POSTED ON 25 AUGUST 2026 AMENDMENT 0003 WAS POSTED ON 21 AUGUST 2026 The Site Visit Roster was posted on 17 August 2026 AMENDMNENT 000…