Federal Contract

CO NP ROMO 407(1) Holzwarth Culvert

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

FEDERAL HIGHWAY ADMINISTRATION

NAICS Code

237310

Department

TRANSPORTATION, DEPARTMENT OF

Solicitation Type

Presolicitation

Solicitation #

6982AF26B000012

PSC Code

Y1LB

Division

6982AF CENTRAL FEDERAL LANDS DIVISI

Performance State

CO

Posted

Tue, August 25, 2026

Response Deadline

Wed, September 9, 2026

Description

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE PROJECT NUMBER: CO NP ROMO 407(1) PROJECT NAME: Holzwarth Culvert PROJECT DESCRIPTION: This project will replace the deficient Holzwarth Culvert (Structure No. 1520-029S), a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge. Located in Rocky Mountain National Park, approximately nine miles north of Grand Lake, CO, along US HWY 34 at an elevation of 8,900 feet, the culvert conveys flow from the Colorado River and provides access to the Holzwarth Historic Site. The purpose of this project is to prevent future roadway damage and flooding while maintaining access to employee housing, the historic site, and National Park Service and Forest Service recreation opportunities. SCOPE OF THE WORK: The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck. New bridge abutments and micropiles. Temporary stream diversion and riprap. New aggregate roadway surfacing. Relocation of an existing electrical line. Relocation of existing historic head gates into a new concrete slab. Access to the site is through a gate at the south end of the Holzwarth Historic Site Parking Lot and along the Holzwarth Culvert Access Road. The Holzwarth Culvert Access Road is approximately 13� wide with tight turns. Temporary widening will be necessary to prevent truck off tracking on to sensitive environmental resources. A temporary truck turnaround will also be necessary as no construction access is allowed more than 100� west of the bridge. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 EACH 30202-2000 Roadway Aggregate, Method 2: 120 TON 55504-0000 Prefabricated Steel Bridge (10� wide x 48� long modular steel vehicular bridge): 1 LPSM 56701-0000 Micropile (8.68� dia.): 180 LNFT 62801-0000 Temporary Stream Diversion: 1 LPSM ANTICIPATED SCHEDULE: Advertisement � September 2026

Similar open contracts

FED

Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

03 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement This amendment effects changes to block 13 of Standard Form 1442, the Solicitation Specif…

DEPT OF THE ARMYPerformance: ORDue Oct 8, 2026Posted Sep 3, 2026
Set-Aside: SBANAICS Code: 237310PSC Code: Y1LBSolicitation Type: Solicitation+3
FED

2026 Gifford Pinchot Culvert Supply

Removing FAR 52.247-29 F.O.B. Origin (FEB 2006) and adding FAR 52.247-34 F.O.B. Destination (JAN 1991) All Else Remains the Same. This is a combined synopsis/solicitation for commercial items prepared…

FOREST SERVICEPerformance: WADue Sep 14, 2026Posted Aug 31, 2026
Set-Aside: SBANAICS Code: 332322PSC Code: 4710Solicitation Type: Combined Synopsis/Solicitation+3
FED

Trickel Park Road Asphalt Grand Mesa, Uncompahgre, and Gunnison National Forest, Colorado

ATTENTION: AMENDMENT 0001 AND ATTACHMENTS HAVE BEEN UPLOADED TO ATTACHMENT AND LINKS. SOLICTATION AND ALL ATTACHMENTS FOR THIS REQUIREMENT ARE FOUND IN THE ATTACHMENTS/LINKS SECTION. Project Title: Tr…

FOREST SERVICEPerformance: CODue Sep 10, 2026Posted Aug 25, 2026
Set-Aside: SBANAICS Code: 237310PSC Code: Y1LBSolicitation Type: Combined Synopsis/Solicitation+3
FL

Three Lakes G111 Replacement

The Florida Fish and Wildlife Conservation Commission is seeking competitive pricing for the replacement of a five-barrel CMP culvert structure and control gates with a cast-in place five-barrel reinf…

Florida Fish and Wildlife Conservation Commission (FWC)Performance: FLDue Oct 6, 2026Posted Aug 20, 2026
Solicitation Type: Invitation to BidDepartment: FWC
FED

2026 Gifford Pinchot Culvert Supply

THE SOLICITAITON IS NOW AMENDED. PROVIDED YOUR QUOTE WITH THE NEW AMENDED SOLICITATION Removing FAR 52.247-29 F.O.B. Origin (FEB 2006) and adding FAR 52.247-34 F.O.B. Destination (JAN 1991) All Else R…

FOREST SERVICEPerformance: WADue Sep 14, 2026Posted Sep 3, 2026
Set-Aside: SBANAICS Code: 332322PSC Code: 4710Solicitation Type: Combined Synopsis/Solicitation+3
FED

Multiple Trail Bridges Replacement Project Phase 2

September 2, 2026 Can previously submitted PPQs be submitted in lieu of obtaining new PPQs? No, previously submitted PPQs cannot be submitted in lieu of obtaining new PPQs On page 3 of the SF1442, the…

FOREST SERVICEPerformance: GADue Sep 8, 2026Posted Sep 2, 2026
Set-Aside: SBANAICS Code: 237310PSC Code: Z1LBSolicitation Type: Combined Synopsis/Solicitation+3