CO NP ROMO 407(1) Holzwarth Culvert
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE PROJECT NUMBER: CO NP ROMO 407(1) PROJECT NAME: Holzwarth Culvert PROJECT DESCRIPTION: This project will replace the deficient Holzwarth Culvert (Structure No. 1520-029S), a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge. Located in Rocky Mountain National Park, approximately nine miles north of Grand Lake, CO, along US HWY 34 at an elevation of 8,900 feet, the culvert conveys flow from the Colorado River and provides access to the Holzwarth Historic Site. The purpose of this project is to prevent future roadway damage and flooding while maintaining access to employee housing, the historic site, and National Park Service and Forest Service recreation opportunities. SCOPE OF THE WORK: The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck. New bridge abutments and micropiles. Temporary stream diversion and riprap. New aggregate roadway surfacing. Relocation of an existing electrical line. Relocation of existing historic head gates into a new concrete slab. Access to the site is through a gate at the south end of the Holzwarth Historic Site Parking Lot and along the Holzwarth Culvert Access Road. The Holzwarth Culvert Access Road is approximately 13� wide with tight turns. Temporary widening will be necessary to prevent truck off tracking on to sensitive environmental resources. A temporary truck turnaround will also be necessary as no construction access is allowed more than 100� west of the bridge. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 EACH 30202-2000 Roadway Aggregate, Method 2: 120 TON 55504-0000 Prefabricated Steel Bridge (10� wide x 48� long modular steel vehicular bridge): 1 LPSM 56701-0000 Micropile (8.68� dia.): 180 LNFT 62801-0000 Temporary Stream Diversion: 1 LPSM ANTICIPATED SCHEDULE: Advertisement � September 2026 …
Similar open contracts
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
03 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement This amendment effects changes to block 13 of Standard Form 1442, the Solicitation Specif…
2026 Gifford Pinchot Culvert Supply
Removing FAR 52.247-29 F.O.B. Origin (FEB 2006) and adding FAR 52.247-34 F.O.B. Destination (JAN 1991) All Else Remains the Same. This is a combined synopsis/solicitation for commercial items prepared…
Trickel Park Road Asphalt Grand Mesa, Uncompahgre, and Gunnison National Forest, Colorado
ATTENTION: AMENDMENT 0001 AND ATTACHMENTS HAVE BEEN UPLOADED TO ATTACHMENT AND LINKS. SOLICTATION AND ALL ATTACHMENTS FOR THIS REQUIREMENT ARE FOUND IN THE ATTACHMENTS/LINKS SECTION. Project Title: Tr…
Three Lakes G111 Replacement
The Florida Fish and Wildlife Conservation Commission is seeking competitive pricing for the replacement of a five-barrel CMP culvert structure and control gates with a cast-in place five-barrel reinf…
2026 Gifford Pinchot Culvert Supply
THE SOLICITAITON IS NOW AMENDED. PROVIDED YOUR QUOTE WITH THE NEW AMENDED SOLICITATION Removing FAR 52.247-29 F.O.B. Origin (FEB 2006) and adding FAR 52.247-34 F.O.B. Destination (JAN 1991) All Else R…
Multiple Trail Bridges Replacement Project Phase 2
September 2, 2026 Can previously submitted PPQs be submitted in lieu of obtaining new PPQs? No, previously submitted PPQs cannot be submitted in lieu of obtaining new PPQs On page 3 of the SF1442, the…