Green Stormwater Infrastructure and Drainage Improvements Project
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Town of Los Gatos is seeking proposals from qualified civil engineering consultants to evaluate and design drainage improvements and green stormwater infrastructure (GSI) at the Town’s Parks and Public Works (PPW) facility and adjacent areas. The project will evaluate opportunities to capture and treat stormwater runoff from building roofs, paved parking and Corp Yard areas, the adjacent ball field and parking lot, and nearby streets where appropriate. The project will also investigate existing drainage deficiencies and flooding concerns affecting the ball field and adjacent parking area. The selected consultant will perform a topographic survey, assess existing drainage conditions, evaluate and size potential GSI facilities, develop and compare alternatives, and prepare a preferred concept, preliminary design plans, and construction cost estimates. The tentative schedule is to complete preliminary design and rough order of magnitude cost estimate by April 2027, complete final design for the GSI improvements by December 2027, and begin construction in March 2028. Drainage improvements may be designed and built under a separate timeline depending on the complexity. The Town may adjust the schedule based on project needs, permitting, funding, and site conditions.