Power meter, power sensor, and and multimeter alongside warranty and calibration
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
UT-Battelle, LLC is the management and operating contractor of Oak Ridge National Laboratory (ORNL). The Fusion Energy Division at Oak Ridge National Laboratory is seeking to procure a Keysight system with power meter, power sensor, and and multimeter alongside warranty and calibration or equivalent. Interested offerors should refer to Attachment C - Bill of Materials for detailed specifications. Attachments: - RFP letter - Attachment A - Terms and Conditions Purchase Order Commercial Products and Services BSD-CS-2154 (09/30/26) - Attachment B - Prime Flowdown Clauses (09/30/36) - Attachment C - Bill of Materials and instructions - Attachment D - Reps and Certs Abbreviated (03/09/26)