155mm M231 and M232-Series Modular Artillery Charge System (MACS) Propelling Charges
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The U.S. Army Contracting Command � Rock Island at Picatinny (ACC-RI-PICA), Picatinny Arsenal, New Jersey 07806-5000, on behalf of the Office of the Project Manager for Combat Ammunition Systems (PM CAS), intends to issue a competitive Request for Proposal (RFP) for the production of the M31 Series-Type Triple Base Propellant in support of the 155mm M231 and M232-Series Modular Artillery Charge System (MACS) Propelling Charges. The Government intends to award up to two Firm-Fixed-Price (FFP) Indefinite Delivery/Indefinite Quantity (ID/IQ) production type contract(s) with five (5) one-year ordering periods, dependent upon Formal Source Selection Evaluations (Best Value with Subjective Tradeoffs). The MACS Propelling Charge consists of two solid propellant charges, the M231 (Low-Zone) and the M232-series (High-Zone), and their associated packaging. The charge system provides a complete zoning solution for the 155mm artillery applications by using multiples of the basic modules through a "build-a-charge" incremental system. The M231 charges are used singly or in pairs for Low Zones (1 and 2) and the M232-series is used in groups of three, four, or five charges for High Zones (3, 4, and 5, respectively). The M31A2 triple base propellant is specifically used for the M232-series high-zone charge to enhance Warfighter capabilities by eliminating the need for �cleaner� rounds between top-zone firings, reducing gun wear, and extending gun-tube life. This propellant is essential for effective artillery operations, supporting both combat missions and training requirements. The M31 Series-Type Triple Base Propellant is a vital component of the 155mm M231 and M232-series propelling charges, which are used in howitzer artillery systems. The MACS offers significant improvements in operational flexibility, performance, logistics, and costs compared to the previous generation of bag propelling charges. The total maximum aggregate contract value will be $2,316,202,800.00 , to include…