Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3223 and 3224
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
SOLICITATION NUMBER: W912DW27RA014. TITLE: Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3223 and 3224 LOCATION: Joint Base Lewis McChord, Washington FSC CODE: Y1AZ - Construction of Other Administrative Facilities and Service Buildings NAICS CODE: 236220, Commercial and Institutional Building Construction ISSUE DATE: on or about 1 October 2026 RESPONSE DATE: on or about 13 November 2026 100% Small Business Set-Aside Construction of Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3223 and 3224. FOR INFORMATION ONLY: This Synopsis is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming. All questions regarding this SYNOPSIS should be submitted in writing via email to the Contract Specialist as noted below. The United States Army Corps of Engineers (USACE) Seattle District anticipates solicitation and award of a Firm Fixed-Price contract resulting from Request for Proposal (RFP) W912DW27RA014. The project intends to convert two (2) existing barrack buildings into an operational facility for 3 tier levels of command. These buildings in general are referred to as �the Hammer Head�. The Hammer Handle has three (3) floors with a crawl space at grade elevation. The Hammer Head is a single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle. The definitive removal / demolition work items for these buildings will require: Hazardous material / debris abatement and removal mostly within the crawl space, partial at ~ 75% removal / demolition of exterior building envelopes, interior walls, etc, removal at ~ 90% removal of mechanical � electrical systems, removal of the existing roof EPDM system (but not the roof framing structure). The definitive repair / new work items for these buildings will require new exterior envelope, new mechanical � electrical systems, new roof TPO system. Other considerations for …