Solicitation: Construct Combat Rescue Helicopter Flight Simulator Facility at Moffett ANGB
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Extended to Dec 11, 2026 by a later notice
Description
The Contractor shall provide non-personal services, to include all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a Combat Rescue Helicopter (CRH) Operational Flight Trainer (OFT) simulator facility at Moffett Air National Guard Base (ANGB), Mountain View, California. This project will provide an approximately 8,202 gross square foot building consisting of a multi-story, high bay area to house the CRH-OFT simulator, with a single-story area containing CRH mission planning, briefing and debriefing rooms, administrative areas for training and support staff, OFT maintenance and parts storage rooms, secure and non-secure telecommunication rooms, latrine facilities and mechanical, electrical and utility support rooms utilizing conventional design and construction. The building will be of permanent construction with electrical, mechanical, HVAC, plumbing, wet sprinkler fire suppression, fire detection, access control, direct digital control, and utility management. The exterior walls will be constructed with cavity wall construction including interior non-load bearing metal studs (or CMU wall backup at Simulator Bay) with gypsum board and exterior CMU veneer and metal panel. Air space and insulation to be located inside the cavity wall to meet Energy Code requirements. The primary roofing materials will be standing seam metal roofing to match other installation facilities and the perimeter sloped roof design will include a prefinished standing seam metal roof panel system over rigid insulation. The exterior walls will be constructed with cavity wall construction including interior non-load bearing metal studs (or CMU wall backup at Simulator Bay) with gypsum board and exterior CMU veneer and metal panel. Main entrance doors will be a pair of anodized aluminum storefront entrance doors with insulating glass including a sidelight. The Mechanical, Electrical, Sim Bay and secondary egress doors will be …
Notice history (15)
- Sep 29, 2026SolicitationDue Nov 11, 2026Viewing
Show 11 earlier notices
- Sep 29, 2026SolicitationDue Nov 11, 2026
- Oct 5, 2026SolicitationDue Nov 13, 2026
- Oct 5, 2026SolicitationDue Nov 13, 2026
- Oct 8, 2026SolicitationDue Nov 13, 2026
- Oct 8, 2026SolicitationDue Nov 13, 2026
- Oct 15, 2026SolicitationDue Nov 13, 2026
- Oct 15, 2026SolicitationDue Nov 13, 2026
- Oct 22, 2026SolicitationDue Nov 13, 2026
- Oct 22, 2026SolicitationDue Nov 13, 2026
- Oct 28, 2026SolicitationDue Nov 27, 2026
- Oct 28, 2026SolicitationDue Nov 27, 2026
- Nov 2, 2026SolicitationDue Nov 27, 2026
- Nov 17, 2026SolicitationDue Dec 11, 2026
- Nov 17, 2026SolicitationDue Dec 11, 2026