Apache Alert Mission Complex
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Pre-Solicitation Notice for Apache Alert Mission Complex Anticipated Solicitation Issue Date: November 2026 Anticipated Solicitation Response Date: December 2026 Set Aside: As the work will be performed outside of the continental United States, no set asides to small business or socioeconomic preference for this solicitation. NAICS: 236220 -- Commercial and Industrial Building Construction, and the Small Business Size Standard is $45,000,000. Contracting Office Address: US Army Corps of Engineers � Middle East District, 201 Prince Frederick Drive, Winchester, VA, 22602 SYNOPSIS: SWM is anticipating a Design-Bid-Build (DBB) award for the Construction of facilities to support and enhance the Apache Alert Mission at Ali Al Salem Air Base in the country of Kuwait. PROJECT SCOPE: The facilities to be constructed include: Four Alert Shelters with Aprons Logistics Readiness Center Maintenance Supply Warehouse with Exterior Storage Shade Guard House Pilot Readiness Facility Petroleum Oil Lubricant (POL) Shed Fire Water Pump House with Water Tank Alert Magazine (option) Forward Arming and Refueling Point (FARP) Parking Sunshades Bunkers Three Electrical Substations All site utilities, incl. Stormwater, Domestic Water, Fire Water, Sanitary Sewer with Lift Station and Leach Field, and Site Electrical and Communications Site Development, incl. Taxiway, Vehicular Pavement, and Parking Lot Helipad and Taxiway Rehabilitation (option) Hardened Aircraft Shelter (HAS) Demolition (option) FARP Expansion (option) Paved Access to Practice Runway (option) The project includes all utilities, site improvements, new concrete aprons, airfield and vehicular pavements, detection and protection features, security enhancements, and other supporting work necessary to construct complete and useable facilities. The project is phased to maintain uninterrupted airfield and squadron alert and training operations during construction. The Period of Performance is anticipated to be 1,355 calendar days fr…