FLOW METER AND RAIN GAUGE REPLACEMENT
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for the removal and replacement of twelve (12) flow meters and control systems, three (3) of which will also require the removal and installation of combined sewer overflow level sensors, and the removal and installation of seven (7) rain gauges and control systems along with technical support, support equipment, and accessories as shown and specified. Bidders are directed to Section 01010 Summary of Work for specific details. The Work shall be located in the City/Town of Hartford, Newington, Bloomfield, West Hartford, and Weathersfield; in the State of Connecticut.