DOT HQ Replacement Moveable Bollards
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The contractor shall provide construction services for design-bid-build projects to replace the hydraulic bollard system outside the East building three (3) bay loading dock to include the 27 hydraulic bollards and associated equipment and controls. The north and south loading dock bays entrances have ten (10) bollards outside the loading dock doors for protection and the center loading dock bay entrance has seven (7) bollards outside the loading dock door. This requirement is being held for current contract holders of the East Coast Corridor IDIQ.
Similar open contracts
DOT HQ Replacement Moveable Bollards
The contractor shall provide construction services for design-bid-build projects to replace the hydraulic bollard system outside the East building three (3) bay loading dock to include the 27 hydrauli…
DOT HQ Replacement Moveable Bollards
The contractor shall provide construction services for design-bid-build projects to replace the hydraulic bollard system outside the East building three (3) bay loading dock to include the 27 hydrauli…
Pier B On-Dock Rail Support Facility West Expansion & Street Realignment, CA
The Work required by this Contract includes, but is not limited to, the following: Lengthen Pier B Yard westerly and add three new storage tracks. Reconfigure ladder tracks at the west end of the proj…
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
03 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement This amendment effects changes to block 13 of Standard Form 1442, the Solicitation Specif…
56--HOFU REMOVE AND REPLACE FENCE AT BALLY
Amendment 0002 - provides Q&As, revised map, revised SOW and extends offer due date. PROJECT DESCRIPTION: The National Park Service (NPS) requires the removal and installation of approximately 450lf o…
W9123726QA076 Service Barge 185 Drydocking and Repairs
This requirement covers drydocking and repair services to Service Barge 185, operated by the Regional Rivers Repair Fleet (R3F), Heavy Capacity Fleet (HCF), located at the Louisville Repair Station in…