Florida

Addendum 1 - BDC05-26-27 Madison Blue Spring - Retaining Wall

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

Department of Environmental Protection (DEP)

Department

DEP

Solicitation Type

Invitation to Bid

Performance State

FL

Posted

Tue, September 29, 2026

Response Deadline

Tue, October 6, 2026

Description

September 29, 2026 NOTICE TO APPLICANTS ADDENDUM NO. ONE (1) Madison Blue Spring - Retaining Wall DEP BID NO. BDC05-26/27 TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION. NOTICE It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid. _______________________________________ Signature of Contractor and Date The following statements supersede & supplement the corresponding items in the specifications & drawings: Question: Specifically, could you please confirm whether the retaining wall is specified or being considered as a precast concrete system? If precast concrete is included in the project requirements, or if it may be accepted as an alternate, our company would be very interested in reviewing the project and potentially submitting a bid as a precast concrete manufacturer/supplier? Answer: The rock gabion wall was designed as a replacement intended to match the existing wall as closely as possible in order to preserve the overall aesthetics of the site. Therefore, Hydra does not believe that a concrete wall would be an acceptable alternative design. If FDEP would prefer that the precast concrete wall be evaluated as an acceptable alternative, additional engineering analysis would be required to assess the adequacy of the change in material. In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

Similar open contracts