Dresser Recharge Facility, Structures, and Pipeline Project, CA
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Construction of the Dresser Recharge Facility, including recharge basin earthwork, channel improvements, concrete turnout and headwall structures, slide gates, RCP and PVC pipeline installation, a 48-inch transfer pipeline, 60-inch steel-cased road crossing, rip-rap and geotextile, well facility improvements, deep-well turbine pump and motor, electrical and controls, fencing, paving restoration, and related appurtenances. Also seeking Veteran Owned Small Business (VOSB) /Labor Surplus Area firms
Similar open contracts
Dresser Recharge Facility, Structures, and Pipeline Project
Dresser Recharge Facility, Structures, and Pipeline Project. Owner: Shafter Water Irrigation District. Bid/Contract #: --. Location: Shafter, Kern, CA. Learn more at dbegoodfaith.com/item.php?item_typ…
26-328070 DWR - Electric Vehicle Supply Equipment - Buena Vista Pumping Plant 13642
DWR - ELECTRIC VEHICLE SUPPLY EQUIPMENT - BUENA VISTA PUMPING PLANT CALIFORNIA DEPARTMENT OF WATER RESOURCES TAFT, KERN COUNTY, CA CONTRACT NUMBER: 26-328070, PROJECT NUMBER: 13642 This project is b…
Lift Station #46 Rehabilitation
The Scope of Work for the Lift Station #46 Rehabilitation includes, but is not limited to: A. Discharge Piping : Replace existing discharge piping and risers. B. Wet Well Rehabilitation : Clean, repai…
Project 13641.DWR. EVSE TEERINK PUMPING PLANT. Contract 26-330852
STATE OF CALIFORNIA DEPARTMENT OF GENERAL SERVICES EXECUTIVE OFFICE ¿ SUSTAINABILITY ADVERTISEMENT FOR BIDS DWR ¿ ELECTRIC VHICLE SUPPLY EQUIPMENT ¿ TERRINK PUMPIN PLANT CALIFONIA DEPARTMENT OF WATE…
JCSD Intervalley Pipeline Project
The projects consist of demolition, furnishing, installing, testing and making operational 3.3 miles of 42- inch cement mortar lined and coated steel potable water transmission pipeline and associated…
JCSD Intervalley Pipeline Project in CA
Project consist of furnishing, installing, testing and making operational 3.3 miles (or approx.17,ooo LF) of 42- inch cement mortar lined and coated steel potable water transmission pipeline and assoc…