FY27 NRM - EHRM Base 573-27-702-DB EHRM Generator Upgrades Design-Build - Gainesville VAMC
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
SYNOPSIS: INTRODUCTION: This Sources Sought Notice is for market research and information purposes only at this time and shall not be construed as a solicitation or as an obligation on the part of the Department of Veterans Affairs (VA). The VA Office of Facilities Acquisition (OFA), Program Contracting Activity Center (PCAC) is conducting market research to identify qualified sources capable of performing a Design-Build (DB) project. Services to include Architect and Engineering (DB A/E) design services, site preparation and DB Construction (DB C) services for the construction of Emergency Power Generator Upgrade for Electronic Health Record Modernization at the Malcom Randall VA Medical Center (VAMC) located in Gainesville, Florida. PROJECT DESCRIPTION: The Malcom Randall VA Medical Center (Gainesville VAMC) has a requirement to design and construct an Emergency Power Generator Upgrade to support Electronic Health Record Modernization (EHRM) at the Malcom Randall VA Medical Center. This Design-Build Team (DBT) shall provide all design and construction services, investigations, labor, materials, equipment, supervision, transportation, permits, temporary emergency power, demolition, lawful disposal, site improvements, testing, commissioning, training, and documentation necessary to deliver a complete turnkey Emergency Power Generator Upgrade for EHRM at MRVAMC. The DBT shall evaluate existing conditions and deliver a code-compliant operational emergency power system while protecting the existing Emergency Power Switchboard and maintaining required hospital emergency power capability throughout construction, subject only to specifically approved planned switching windows. The facility's existing 1,275 kW emergency generator (Generator #5) reportedly operates at approximately 85% load; the Contractor shall independently verify actual demand and operating conditions. Planned EHRM infrastructure is estimated to add 150-200 kW of critical load, including IDF/telecommunic…