Federal Contract

Autonomous Kitchen � Robotics-as-a-Service (RaaS) -Month To Month Lease- Location: South Korea

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

DEPT OF THE ARMY

NAICS Code

423830

Department

DEPT OF DEFENSE

Solicitation Type

Combined Synopsis/Solicitation

Solicitation #

W90VN926QA065

PSC Code

W099

Division

0906 AQ CO DET A CONTRACTI

Posted

Thu, September 24, 2026

Response Deadline

Thu, October 15, 2026

Description

Solicitation Number: W90VN926QA065 ******Amendment Number: 0002. Effective Date: 24 September 2026 A. PURPOSE OF AMENDMENT. The purpose of this amendment is to clarify the evaluation methodology for Factor 1 � Technical Capability under the Addendum to FAR 52.212-2 (Evaluation�Commercial Products and Commercial Services), specifically paragraph 18.2. This amendment does not change the closing date and time for receipt of quotations, does not change the Performance Work Statement or Technical Exhibit 1, and does not change any other evaluation factor. B. DESCRIPTION OF CHANGE � PARAGRAPH 18.2. Paragraph 18.2 of the Addendum to FAR 52.212-2 is revised in its entirety to clarify that Factor 1 � Technical Capability is evaluated on an Acceptable or Unacceptable basis as a whole. The five technical elements listed in paragraph 18.4 are considered collectively under a single overall Factor 1 rating. The revised language reads as follows: 18.2 Acceptable / Unacceptable Determination (Factor 1 as a Whole) The Government will evaluate Factor 1 � Technical Capability on an Acceptable or Unacceptable basis as a whole. The technical elements listed in paragraph 18.4 will be considered collectively. A quotation will be rated Acceptable under Factor 1 if, when considered as a whole, it demonstrates a credible plan and supporting detail showing that the proposed solution meets the minimum requirements of the PWS and Technical Exhibit 1 and can achieve the required outcomes in the ROK / Camp Walker / INDOPACOM environment.A quotation will be rated Unacceptable under Factor 1 if, when considered as a whole, it fails to demonstrate a credible plan or supporting detail for the mandatory requirements, or merely restates the PWS without describing the proposed approach.Only quotations rated Acceptable under Factor 1 will proceed to the comparative evaluation. A quotation rated Unacceptable under Factor 1 will be restricted from further consideration for award. 18.2.1 Rating Scale � Tech…

Similar open contracts