P110 Cape Canaveral Railhead and Transfer Facilities at Kennedy Space Center, Florida
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
PRE-SOLICITATION SYNOPSIS NOTICE ONLY: THE SOLICITATION WILL BE AVAILABLE ON OR ABOUT NOVEMBER 5, 2026, AT HTTPS://SAM.GOV/. THE SOLICITATION NUMBER IS N6945027R0006, FOR THE DESIGN-BID-BUILD (DBB) CONSTRUCTION PROJECT, P110 CAPE CANAVERAL RAILHEAD AND TRANSFER FACILITIES, KENNEDY SPACE CENTER, FLORIDA PROJECT TITLE: DESIGN-BID-BUILD CONSTRUCTION PROJECT, FY27, P110 CAPE CANAVERAL RAILHEAD AND TRANSFER FACILITIES, KENNEDY SPACE CENTER, FLORIDA PSC: Y1LB - Construction of Highways, Roads, Streets, Bridges, and Railways NAICS: 237990 - Other Heavy and Civil Engineering Construction THIS IS NOT A REQUEST FOR PROPOSALS OR AN INVITATION FOR BID. NO CONTRACT WILL BE AWARDED FROM THIS ANNOUNCEMENT. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS. No telephone calls will be accepted requesting a bid package or solicitation. There is no bid package or solicitation currently available. In order to protect the procurement integrity of any future procurement that may arise from this announcement, information regarding the technical point of contact will not be given and no appointments for presentations will be made. Project Description: The project will include but is not limited to the following: Constructs railroad trackage to connect and facilitate the transfer from commercial rail to the on-base processing facility at Cape Canaveral. Constructs a low-rise open air standing seam-metal roofed canopy on a reinforced shallow foundation with wide-flange beams and columns and continuous footings for a Submarine Launched Ballistic Missile Processing Facility (Motor Transfer Facility). Functions include receiving and shipping missile motors, components and Active Inert Missiles (AIMS) which require superflat floors for air pallet operations. The roof structure will include sloped, uninsulated metal roof panels on steel joists. The estimated Period of Performance is 527 calendar…