Federal Contract

FY27 NRM | 460-26-011 - CON Replace West Entrance Return Air Gan | NCO 4 Construction East (VA-26-00069614)

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

VETERANS AFFAIRS, DEPARTMENT OF

NAICS Code

236220

Set-Aside

SDVOSBC

Department

VETERANS AFFAIRS, DEPARTMENT OF

Solicitation Type

Presolicitation

Solicitation #

36C24426B0025

PSC Code

J041

Division

244-NETWORK CONTRACT OFFICE 4 (36C244)

Performance State

DE

Posted

Mon, November 23, 2026

Response Deadline

Mon, December 21, 2026

Description

VA Medical Center Wilmington intends to issue a construction contract. The project consists of: The Contractor shall provide all labor, transportation, materials, equipment, and supervision required for Replace West Entrance Return Air Fan as required at the Wilmington VA Healthcare System, located at 1601 Kirkwood HWY, Wilmington, Delaware 19805. Replace West Entrance Return Air Fan Area is located on the roof of Building 17. Work to take place during normal working hours. Provide correct size crane per lift requirements. Remove existing failed Return Air Fan. Disconnect Electrical power, control signal cabling Install new Return Air Fan ( provided by the VA). COOK Model Number 245QMXD11 900 lbs shipping weigh (see Atch 1) Properly dispose of old return air fan. Perform all necessary commissioning and startup of new equipment. All work to be performed in accordance with manufacturer s recommendations and guidelines. All Federal and State Safety and Environmental guidelines shall be followed. Work to be conducted during normal working hours. Extended hours may be arranged if necessary to fully complete performance of the work. The contractor will need to provide a certified crane operator to remove the old parts and install the new fan motor and housing parts on the roof top. Crane lift plan to be submitted, reviewed and approved by COR prior to commencement of work. Verification that return fan remains integrated into existing BAS system. Currently Johnson Controls speaking BACNET. Work to be scheduled to interfere as little as possible with normal VA operations. Crane lift is to be performed off hours to ensure that NO personnel are below the area of swing during the crane lift evolution. Other Specifics: Prime Contractor to plan all phasing of work in coordination with Hospital staff in order to minimize down-time to areas affected by the project. Construction Waste Management, Specification 01 74 19 is to be included. Prime Contractor to maintain all infection c…

Similar open contracts