Harnett Regional Water Southwest Wastewater Pump Station & Force Main
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The project consists of one (1) contract with two (2) sections. Section A includes the upgrade of the existing SLS #57 sewer pump station including headworks modifications, replacement of two (2) existing 100 HP submersible pumps, new lime feed system, and electrical, SCADA, and controls. Section B includes the installation of 26,220 LF of 20” sewer force main, and all appurtenances. The project shall include all sitework, piping, fittings, valves, appurtenances, and other items required for a complete functioning project as shown on the Contract Drawings and included in the detailed specifications.