Repair Clc Shower Access 538-25-206
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Project Number: 538-25-206 Project Title: Repair CLC Shower Access Location: Chillicothe VA Medical Center, 17273 SR 104, Chillicothe, Ohio 45601 Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) The Department of Veterans Affairs (VA), Network Contracting Office (NCO) 10, anticipates issuing a solicitation for Project No. 538-25-206, Repair CLC Shower Access, at the Chillicothe VA Medical Center located in Chillicothe, Ohio. PROJECT DESCRIPTION The Contractor shall furnish all labor, materials, equipment, supervision, transportation, demolition, disposal, permits, and incidental services necessary to complete the work shown on the contract drawings and specifications. Building 210 Sherman Terrace (Swing Space) In Community Living Center (CLC) Building 210, Floor 1, Sherman Terrace, West Wing Meadowlark Lane, the Contractor shall create a temporary swing space for Veterans by constructing temporary walls and doors to support phased construction activities. Building 211 Hopewell House (Shower Renovations) The work in CLC Building 211, Floor 1, Hopewell House, East Wing Washington Way and West Wing Jefferson Way, shall be performed in two phases and includes, but is not limited to: Installation and maintenance of infection control and dust containment barriers for affected patient care areas and individual Veteran rooms, as required. Pre-construction slip-resistance testing. Removal and subsequent reinstallation of nurse call equipment associated with shower areas. Demolition of existing tile bathroom floors, prefabricated shower inserts, and shower lighting fixtures. Regrading of shower floors to existing drains. Construction of new tiled shower assemblies. Removal and replacement of thermostatic shower mixing valves. Installation of new floor and wall tile finishes. Installation of new shower lighting fixtures. Painting of affected walls and ceilings. Post-construction slip-resistance testing. Removal of temporary infection control and dust cont…