RFB 27-54218 Burruss Park Bridge Construction
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The City of Marietta wishes to remove an existing triple (42") culvert drain passing under Burriss Park main trail, replacing it with a 60' prefabricated bridge. The Scope of Work includes but is not limited to the removal of the existing culverts, headwalls, trail surface, trees, etc. Project includes the construction of bridge abutments, improvements to the stream bank and the installation of the prefabricated vehicular rated bridge. The bridge will be furnished to the site by the city. The general contractor will be required to coordinate all their work with delivery of the bridge.