Switch, Pressure
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Contract Specialist: Caitlin Ferry Email: caitlin.ferry@dla.mil NSN: 5930-01-324-5328 Approved Source(s) � Cameron Energy Services Corp. CAGE 05991 P/N 115659122FN23 Cameron Energy Services Corp. CAGE 05991 P/N 20BCXXX0250A5ABAXX03 Cameron Energy Services Corp. CAGE 05991 P/N P-1-29-16 ------------------------------------------------ The AMC/AMSC for the NSN listed above is �3C� AMC "3" Acquire, for the second or subsequent time, directly from the actual manufacturer. AMSC "C" This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing knowledge by the qualified source(s) require acquisition of the part from the approved source(s). The approved source(s) retain data rights, manufacturing knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. If one source is approved, AMCs 3, 4, or 5 are valid. If at least two sources are approved or if data is adequate for an alternate source to qualify in accordance with the design control activity's procedures, AMCs 1 or 2 are valid. ---------------------------------------------------------------------------------------------------------- Please review the NSN listed above and provide any sources that may be able to manufacture these items. The approved sources for this NSN are currently listed above. All information may be submitted directly to the Contract Specialist listed above. This information must be provided by the response date indicated above. Should a company wish to be reviewed a…