Depot Intermediate Level and Non-Recurring Engineering (DINRE) FY30-34
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The F-35 Lightning II Joint Program Office (JPO) intends to award a sole-source contract to Lockheed Martin Corporation, Lockheed Martin Aeronautics Company (LM Aero), Fort Worth, Texas, for F-35 non-recurring sustainment support. The scope being procured under the Depot, Intermediate Level, and Non-Recurring Engineering (DINRE) contract includes: Depot Activation; Intermediate-level Maintenance; Sustainment Non-Recurring Engineering Efforts; Reliability, Maintainability, and Health Maturation; Structural Integrity Program and Low Observable Maturation; Structural Integrity Program and Low Observable Maturation; Depot Analysis, Planning, and Implementation; Depot Material Lay-In (MLI); Depot Material Activation; Depot Test Systems Development and Support; eCASS (electronic consolidated automated support system) Repair, Test, and Check; Depot-specific Support Equipment (SE); Maintenance Plan Change (MPC) project opportunities; and organic software maintenance support capabilities. This acquisition is being pursued on a sole-source basis under the statutory authority of 10 U.S.C. 3204(a)(1) (formerly 10 U.S.C. 2304(c)(1)), as implemented by FAR 6.302-1, "Only one responsible source and no other supplies or services will satisfy agency requirements." LM Aero is the original designer, developer, and manufacturer of the F-35 aircraft and is the only source with the capabilities required to provide sustainment support for F-35 aircraft. LM Aero solely possesses the proprietary design knowledge, technical data rights, and engineering capabilities required to perform this highly specialized work. Because the DINRE contract represents an integrated, highly complex requirement of non-recurring activations and engineering efforts, breaking out individual activation tasks, regional depot lines, or test program sets to alternate vendors is economically and operationally impracticable. Attempting to segregate these tasks would require the Government to duplicate massive, cost-pro…
Notice history (2)
- Nov 16, 2026PresolicitationDue Dec 4, 2026
Depot Intermediate Level and Non-Recurring (DINRE) FY30-34
- Nov 16, 2026PresolicitationDue Dec 4, 2026Viewing