Site Visit - Removal of Old Fluid Cell
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Contractor shall provide to the Maintenance Support Group (MXSG) all the tools, parts, materials, equipment, labor, and transportation necessary to decommission, remove, and dispose of one (1) Quintus ABB QFC 1.6 x 4-1400 fluid cell press. The equipment is located in building 140 at Robins Air Force Base (AFB), Georgia. Decommissioning services shall include dismantling, rigging, relocating the components to a designated on-base cutting site, reduction of major components to recyclable sizes, and hauling all resulting scrap and debris off Robins AFB. Upper Filler Piece: 64,000 lbs; Pressure Plate: 32,000 lbs; Lower Filler Piece: 86,000 lbs; Unwound Main Cylinder: 148,000 lbs; Plating attached to Lower Filler: 7,000 lbs (see Performance Work Statement for full details)