CJAG Monitoring Well Closures
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The requirement is for the proper abandonment and closure of nine groundwater monitoring wells at Load Line 6, Camp James A. Garfield Joint Military Training Center, Ravenna, Ohio. The contractor shall provide all labor, equipment, materials, utility locating, well closure services, waste management, restoration, seeding, and reporting necessary to complete the work. The contractor must prepare an OHARNG-approved work plan before field work, comply with applicable Ohio and federal well-closure requirements, manage and dispose of waste, restore each well location to original conditions, and submit well sealing reports and a final closure summary report. All work and deliverables must be completed within 90 calendar days after award.
Similar open contracts
CJAG Monitoring Well Closures
Amendment: 1, Extended quotes due, extended questions due, adjusted evaluation, added Q&A Q&A Question 1. Are you looking to hire the drillers directly, or would you want the prime to subcontract and …
SOR Waterline Repair
The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control syste…
SOR Waterline Repair
The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control syste…
B836 Replace Electrical in Airfield Lighting Vault
NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associa…
Barren River Lake Repair Drainage Ditch at Tailwater Stilling Basin
Barren River Lake Repair Drainage Ditch at Tailwater Stilling BasinThe contractor?????????????????????????????????????????????????????????????????????????????????s work and responsibility will include…
FY26 Multiple Location BEQ Chiller Loop Flushing and Chemical Cleaning
Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of wor…